Dutypoint EUHPC08045V Скачать руководство пользователя страница 5

Product Specifications

5

3 Product 

Specifications

All dimensions are in mm unless otherwise stated (tol/- 10mm). All unvented installations must comply with the following 
building regulations:

England & Wales: G3 Building Regulations

Scotland: Technical Standard P3

Northern Ireland: Building Regulation P5

Table 1:

Product Codes and Specifications

Product Code

Capacity 

(litres)

Pressure 

Rating 

(Bar)

Expansion 

Vessel 

Capacity 

(litres)

Diameter 

(mm)

Height 

(mm)

Dry 

Weight 

(kg)

Full 

Weight 

(kg)

Coil 

Capacity 

(kW)

Reheat 

Time*

Heat Loss 

(kWh/24hr @ 

65°C)

Vertical

EUHPC08045V

80

4.5

12

576

665

25

105

3

17

0.92

EUHPC08060V

80

6

12

576

665

25

105

3

17

0.92

EUHPC15045V

150

4.5

24

576

1085

40

190

14

31

1.36

EUHPC15060V

150

6

24

576

1085

40

190

14

31

1.36

EUHPC17545V

175

4.5

24

576

1242

45

220

20

26

1.53

EUHPC17560V

175

6

35

576

1242

45

220

20

26

1.53

EUHPC21545V

215

4.5

35

576

1484

50

265

20

32

1.72

EUHPC21560V

215

6

35

576

1484

50

265

20

32

1.72

EUHPC25045V

250

4.5

35

576

1752

55

310

20

38

1.87

EUHPC25060V

250

6

50

576

1752

55

310

20

38

1.87

EUHPC30045V

300

4.5

50

576

2028

60

365

20

45

2.05

EUHPC30060V

300

6

50

576

2028

60

365

20

45

2.05

EUHPC40045V

400

4.5

80

756

1405

85

485

27

39

2.66

EUHPC40060V

400

6

80

756

1405

85

485

27

39

2.66

EUHPC50045V

500

4.5

100

756

1690

105

605

27

48

3.22

EUHPC50060V

500

6

100

756

1690

105

605

27

48

3.22

Horizontal

EUHPC15045H

150

4.5

24

1085

576

40

190

14

31

1.36

EUHPC15060H

150

6

24

1085

576

40

190

14

31

1.36

EUHPC17545H

175

4.5

24

1242

576

45

220

20

26

1.53

EUHPC17560H

175

6

35

1242

576

45

220

20

26

1.53

EUHPC21545H

215

4.5

35

1484

576

50

265

20

32

1.72

EUHPC21560H

215

6

35

1484

576

50

265

20

32

1.72

EUHPC25045H

250

4.5

35

1752

576

55

310

20

38

1.87

EUHPC25060H

250

6

50

1752

576

55

310

20

38

1.87

EUHPC30045H

300

4.5

50

2028

576

60

365

20

45

2.05

EUHPC30060H

300

6

50

2028

576

60

365

20

45

2.05

*Re-heat time based on 70% draw-off at 65°C, cold water at 10°C

Содержание EUHPC08045V

Страница 1: ...Ultra High Performance Indirect Hot Water Cylinders User Guide Document Reference DOC EUHPCOM1701...

Страница 2: ...ion 3 2 Models and Performance 4 3 Product Specifications 5 4 Installation Instructions 6 5 Wiring Instructions 11 6 Tundish 14 7 Discharge Pipework 15 8 Commissioning 17 9 Maintenance 18 10 Fault Fin...

Страница 3: ...erty There is no longer a requirement to have a tank in the roof system 1 2 The Benefits of Element by Dutypoint Unvented UHP Cylinders Operating pressures up to 6 0 bar dependent on model High flow r...

Страница 4: ...e 240V Immersion Heater Power 3kW 6kW option available Insulation Thickness 60mm Pressure Relief Valve Setting 4 5 bar models 6 bar Pressure Relief Valve Setting 6 bar models 8 bar EUHPC30060V S6 2C F...

Страница 5: ...4 5 35 576 1484 50 265 20 32 1 72 EUHPC21560V 215 6 35 576 1484 50 265 20 32 1 72 EUHPC25045V 250 4 5 35 576 1752 55 310 20 38 1 87 EUHPC25060V 250 6 50 576 1752 55 310 20 38 1 87 EUHPC30045V 300 4 5...

Страница 6: ...he installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales All installations must be notified to Local A...

Страница 7: ...appliance requirements 4 10 Inlet Group The inlet group will vary depending on whether the vessel is fitted as internal or external expansion see Figure 1 Figure 2 Figure 3 4 11 Connecting the Water...

Страница 8: ...d in the cold water inlet to facilitate draining of the cylinder see Figure 1 A swept tee is needed for all indirect models if secondary circulation is required and is fitted as per the illustration A...

Страница 9: ...relief valve and the cylinder see figure 2 and should always be positioned with the entry point at the bottom Installation should always be by means of a standard T connector ensuring no other valve...

Страница 10: ...Installation Instructions 10 Figure 4 Combination Inlet Valve Mains water connection Balanced cold water if required To expansion vessel Supply to cylinder Pressure relief valve connection...

Страница 11: ...linder Range WARNING ALL ELECTRICAL WIRING SHOULD BE CARRIED OUT BY A COMPETENT ELECTRICAL CONTRACTOR AND MUST CONFORM TO THE LATEST IEE WIRING REGULATIONS Do not switch the power on until the unit ha...

Страница 12: ...be fitted in the cold water inlet to facilitate draining of the cylinder Not supplied IMPORTANT ENSURE THAT THE IMMERSION HEATER THERMOSTAT IS SET TO A MAXIMUM OF 60 C Figure 7 Immersion Heater Conne...

Страница 13: ...ions 13 5 2 Fitting the Twin Thermostat Figure 8 Cylinder Thermostat and Thermal Cut Out Connections Insert probes through hole in housing Secure front face using self tapping screws provided Housing...

Страница 14: ...ipework must be continuous and the pipe should terminate in the gully or be bent backwards onto an outside wall in a place where discharge cannot be injurious to persons Figure 9 Tundish Installation...

Страница 15: ...h should terminate in a safe place where there is no risk to persons in the vicinity of the discharge Examples of acceptable discharge arrangements are To a trapped gully with the end of the pipe belo...

Страница 16: ...ALLIC RAINWATER GOODS MAY BE DAMAGED BY SUCH DISCHARGES Take necessary precautions Metal discharge pipe D1 from temperature relief valve to tundish Sleeved through wall Discharge below xed grating Fix...

Страница 17: ...the performance of the unit If no de scaler or softener is used then the heating elements will require periodic de scaling for maximum efficiency and to prevent damage 8 3 User Instructions Your Elem...

Страница 18: ...nt This product should be serviced regularly to optimise its safety efficiency and performance The service engineer should complete the relevant Service Record on the Benchmark Checklist after each se...

Страница 19: ...air gap needs replenishing Follow steps listed in Servicing maintenance section Only cold or lukewarm water comes out of taps Programmer set to heating only or not switched on for hot water Set progra...

Страница 20: ...rrent at the time of installation EU standards and is not fed with water from a private source It had not been modified in any way It has not been subjected to excessive pressure or electrolytic actio...

Страница 21: ...t packaging Observe national regulations 12 2 Cylinder disposal You must not dispose of the cylinder or any of its accessories in normal domestic rubbish The cylinder and accessories must be disposed...

Страница 22: ...Dutypoint Limited Shepherd Road Gloucester GL2 5EL United Kingdom T 44 0 1452 300592 W www dutypoint com...

Отзывы: