Dutypoint EUHPC08045V Скачать руководство пользователя страница 18

Maintenance

18

9 Maintenance

Servicing and maintenance should only be carried out by a competent unvented hot water installer or Dutypoint authorised 
personnel.

WARNING: BOTH THE PRIMARY AND SECONDARY SYSTEMS WILL CONTAIN VERY HOT WATER THAT WILL SCALD

— Care must be taken when opening any joints, seals or valves.
— The system must be isolated from the electricity supply.

WARNING: NON-GENUINE PARTS CAN BE DANGEROUS AND WILL INVALIDATE WARRANTY

— Only use spare parts authorised by Dutypoint.

This product should be serviced regularly to optimise its safety, efficiency and performance. The service engineer should complete 
the relevant Service Record on the Benchmark Checklist after each service.

9.1 Replacing air gap if lost during service (external air gap - expansion vessel 
fitted)

1)

Turn off the mains supply to the unvented hot water cylinder

2)

Open a hot water tap, preferably on the same floor or the floor below where the cylinder is located to relieve pressure.

3)

Check pressure within expansion vessel. Re-pressurise to 6 bar (4.5 bar models) or 8 bar (6 bar models).

4)

Close the hot water tap.

5)

Turn the mains supply back on and bring the cylinder up to working pressure.

Содержание EUHPC08045V

Страница 1: ...Ultra High Performance Indirect Hot Water Cylinders User Guide Document Reference DOC EUHPCOM1701...

Страница 2: ...ion 3 2 Models and Performance 4 3 Product Specifications 5 4 Installation Instructions 6 5 Wiring Instructions 11 6 Tundish 14 7 Discharge Pipework 15 8 Commissioning 17 9 Maintenance 18 10 Fault Fin...

Страница 3: ...erty There is no longer a requirement to have a tank in the roof system 1 2 The Benefits of Element by Dutypoint Unvented UHP Cylinders Operating pressures up to 6 0 bar dependent on model High flow r...

Страница 4: ...e 240V Immersion Heater Power 3kW 6kW option available Insulation Thickness 60mm Pressure Relief Valve Setting 4 5 bar models 6 bar Pressure Relief Valve Setting 6 bar models 8 bar EUHPC30060V S6 2C F...

Страница 5: ...4 5 35 576 1484 50 265 20 32 1 72 EUHPC21560V 215 6 35 576 1484 50 265 20 32 1 72 EUHPC25045V 250 4 5 35 576 1752 55 310 20 38 1 87 EUHPC25060V 250 6 50 576 1752 55 310 20 38 1 87 EUHPC30045V 300 4 5...

Страница 6: ...he installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales All installations must be notified to Local A...

Страница 7: ...appliance requirements 4 10 Inlet Group The inlet group will vary depending on whether the vessel is fitted as internal or external expansion see Figure 1 Figure 2 Figure 3 4 11 Connecting the Water...

Страница 8: ...d in the cold water inlet to facilitate draining of the cylinder see Figure 1 A swept tee is needed for all indirect models if secondary circulation is required and is fitted as per the illustration A...

Страница 9: ...relief valve and the cylinder see figure 2 and should always be positioned with the entry point at the bottom Installation should always be by means of a standard T connector ensuring no other valve...

Страница 10: ...Installation Instructions 10 Figure 4 Combination Inlet Valve Mains water connection Balanced cold water if required To expansion vessel Supply to cylinder Pressure relief valve connection...

Страница 11: ...linder Range WARNING ALL ELECTRICAL WIRING SHOULD BE CARRIED OUT BY A COMPETENT ELECTRICAL CONTRACTOR AND MUST CONFORM TO THE LATEST IEE WIRING REGULATIONS Do not switch the power on until the unit ha...

Страница 12: ...be fitted in the cold water inlet to facilitate draining of the cylinder Not supplied IMPORTANT ENSURE THAT THE IMMERSION HEATER THERMOSTAT IS SET TO A MAXIMUM OF 60 C Figure 7 Immersion Heater Conne...

Страница 13: ...ions 13 5 2 Fitting the Twin Thermostat Figure 8 Cylinder Thermostat and Thermal Cut Out Connections Insert probes through hole in housing Secure front face using self tapping screws provided Housing...

Страница 14: ...ipework must be continuous and the pipe should terminate in the gully or be bent backwards onto an outside wall in a place where discharge cannot be injurious to persons Figure 9 Tundish Installation...

Страница 15: ...h should terminate in a safe place where there is no risk to persons in the vicinity of the discharge Examples of acceptable discharge arrangements are To a trapped gully with the end of the pipe belo...

Страница 16: ...ALLIC RAINWATER GOODS MAY BE DAMAGED BY SUCH DISCHARGES Take necessary precautions Metal discharge pipe D1 from temperature relief valve to tundish Sleeved through wall Discharge below xed grating Fix...

Страница 17: ...the performance of the unit If no de scaler or softener is used then the heating elements will require periodic de scaling for maximum efficiency and to prevent damage 8 3 User Instructions Your Elem...

Страница 18: ...nt This product should be serviced regularly to optimise its safety efficiency and performance The service engineer should complete the relevant Service Record on the Benchmark Checklist after each se...

Страница 19: ...air gap needs replenishing Follow steps listed in Servicing maintenance section Only cold or lukewarm water comes out of taps Programmer set to heating only or not switched on for hot water Set progra...

Страница 20: ...rrent at the time of installation EU standards and is not fed with water from a private source It had not been modified in any way It has not been subjected to excessive pressure or electrolytic actio...

Страница 21: ...t packaging Observe national regulations 12 2 Cylinder disposal You must not dispose of the cylinder or any of its accessories in normal domestic rubbish The cylinder and accessories must be disposed...

Страница 22: ...Dutypoint Limited Shepherd Road Gloucester GL2 5EL United Kingdom T 44 0 1452 300592 W www dutypoint com...

Отзывы: