background image

13

Dutchwest

30003847

Heater Controls and Features

Air Controls 

The Dutchwest Convection Heater has two air controls 
that regulate the amount of air drawn into the stove.  
Generally, more air entering the stove allows the fire 
to burn hotter and faster, while less air decreases heat 
output while prolonging the overall burn time.
The 

Primary Air 

control lever

 

is located at the lower 

front edge of the left side (looking from the front of the 
stove). (Fig. 16) The lever operates the two air inlet 
shutters which are on the front of the stove. Opening 
the inlet shutters provides air for primary combustion. 

To open the shutters, turn the lever counterclockwise.  
The shutters are all the way open when the lever points 
toward the front at a ”4:30” position. (Fig. 17)  To close 
the shutters, turn the lever clockwise.  The shutters are 
fully closed when the lever points straight down. (Fig. 
18)
The secondary air inlet, over the side door, admits air 
to the catalytic combustor

 only, 

for high efficiency at 

high combustor temperatures. Use a gloved hand or the 
metal tip of the door handle to adjust this inlet. Opening 
or closing this inlet will not strengthen the fire; generally 
this inlet should be about one turn open for low fires, 
and 1

¹⁄₂

 to 2 turns for medium and high fires.

NOTE:

 Door handles and controls can be hot. A glove 

has been included with your stove. We recommend us-
ing this glove whenever operating door or damper con-
trols and especially when touching cast iron surfaces. 

ST434

Fig. 18

  Closing the primary air supply.

ST434

Dutchwest

heat control

close

8/28/00   djt

ST433

Dutchwest

primary air

8/28/00   djt

Air Inlet 

Shutter

Pull Control 

Lever Forward 

to Open Air 

Shutters

ST433

Fig. 17

  Opening the primary air supply.

ST432

Dutchwest

heat control

8/28/00   djt

Damper

Secondary 

Air Inlet

Side Loading 

Door

Primary 

Air Control 

Lever

Front 

Loading Door

ST432

Fig. 16

  The heater controls.

Operation

Содержание 2460CE

Страница 1: ...HIS MANUAL Retain for future use If this heater is not properly installed operated and maintained a house re may result For safety follow all installation operation and maintenance directions Contact...

Страница 2: ...tates and EN13240 2001 A2 2004 for Europe Dutchwest models are not listed for mobile home installations Patents U S D288357 4502395 4646712 Canada 1235969 Other foreign mechanical patents issued Acces...

Страница 3: ...sq ft 1 112 224 sq m 1200 2400 sq ft 1 Fuel Size type 480 mm 19 wood 560 mm 22 wood 640 mm 25 wood Flue mass gas ow 5 7 g s 7 1 g s 8 4 g s CO emissions 13 O2 1700 ppm 2300 ppm 2300 pmm Weight 172 kg...

Страница 4: ...n Heater must be connected to a sound masonry chimney that meets local codes a relined masonry chimney that meets local codes or to an approved prefabricated metal chimney Whatever kind you use the ch...

Страница 5: ...ego ries a Vitreous enamelled steel pipe complying with BS 6999 1989 1996 b Pipes made from stainless steel as descirbed in BS EN 1008 1 1995 grades 1 4401 1 4404 1 4432 or 1 4436 with ue wall thickne...

Страница 6: ...s with at least three sheet metal screws 3 Secure the chimney connector to the chimney In structions for various installations follow below 4 Con rm that the installed stove and chimney con nector are...

Страница 7: ...chimney The liner of the replace chimney should extend at least to the point at which the chimney connector enters the chimney Follow all the guidelines for installing a chimney connector into a free...

Страница 8: ...e design your installation so the con nector does not pass through a combustible wall If you must use a wall pass through in your installation check with your building inspector before you begin and c...

Страница 9: ...The oor protector must also meet standard requirements for freestanding installations Floor Protection for Fireplace Installations with Standard Legs Fireplace installations with the standard legs an...

Страница 10: ...ecommended rear clearance to noncom bustible surfaces 50 mm 2 NOTE The minimum thickness of solid noncombus tible materials is speci ed in section 2 of Document J in relation to the clearance of the a...

Страница 11: ...l e a s t 3 x D at least 1 5 x D at least 1 5 x D Plan Without Shield Plan With Shield Air space of at least 12 mm between noncombustible shield and combustible material Fluepipe at least 1 5 x D at...

Страница 12: ...quired in many instal lations Refer to the oor protection information found in the Installation Section of this manual Attach the Legs and Heat Shield Place the stove on its back on a soft surface suc...

Страница 13: ...e lever points straight down Fig 18 The secondary air inlet over the side door admits air to the catalytic combustor only for high ef ciency at high combustor temperatures Use a gloved hand or the met...

Страница 14: ...designed to burn natural wood only Do not burn other fuels Never burn pressure treated wood painted or stained wood or glossy newsprint High ef ciencies and low emissions are possible when burning ai...

Страница 15: ...courage creosote formation in the stovepipe and chimney higher temperatures can cause stove parts to burn out prematurely Always operate the stove accord ing to rebox temperatures Besides the air cont...

Страница 16: ...ld be well established within 10 15 minutes You may gradually build it up by adding a few sticks at a time of a progressively larger size Continue to build the re until a live coal bed begins to form...

Страница 17: ...d back of the ash pan Empty the ash drawer regularly typically every one to three days The frequency will vary depending on how hot you run your stove the hotter the re the more wood you burn and the...

Страница 18: ...specially made for this pur pose Dry the glass completely Adjust the Door Latch The door latches must close tightly to ensure a good seal between the each door and the stove plates With time and use t...

Страница 19: ...up Use a 11 mm 7 16 socket wrench with socket extension to adjust the linkage 1 In an alternating pattern rst loosen and then re move the four bolts that secure the top plate to the sides of the stov...

Страница 20: ...od plan on how to handle one Inspect Regularly Clean As Required Inspect the chimney and chimney connector twice monthly and clean if necessary Let the stove cool completely before you inspect the chi...

Страница 21: ...r should be inspected annually for a build up of y ash and cleaned if necessary This may be done during examination of the catalytic combustor When to Suspect A Combustor Problem There are two ways to...

Страница 22: ...all it Be sure rst to carefully wrap a new Interam gasket an extra was provided with your stove around its perimeter before replacement Insert the gasketed combustor gently back into position and repl...

Страница 23: ...ces for creosote and y ash to deposit It is important to follow the operating instructions in order to minimize these deposits and to periodically inspect your catalyst for signs of blockage Masking a...

Страница 24: ...akes the steel chimney support a good draft more quickly than masonry does Steel chimneys are not as attractive as masonry but they are very durable and generally outperform masonry Indoor Outdoor Loc...

Страница 25: ...p within the rebox until reaching a density and temperature at which they ignite With this ignition you may hear a muf ed pop ping sound and see a bit of smoke forced out of the stove This condition i...

Страница 26: ...changes in design materials speci cations prices and discontinue colors and products at any time without notice Dutchwest Convection Heater Models 2460CE 2461CE 2462CE Item Description 2460CE 2461CE...

Страница 27: ...Collar 7000969 7000969 1304280 35 Leg 7000016 7000016 7000016 36 Damper Handle Stub 5004265 5004265 5004265 37 Ash Door Handle 5004237 5004237 5004237 38 Ash Pan 7000G79 7000G69 7000G89 39 Gasket for...

Страница 28: ...28 Dutchwest 30003847...

Страница 29: ...29 Dutchwest 30003847...

Страница 30: ...30 Dutchwest 30003847...

Страница 31: ...lusions Limitations 1 This product must be installed or serviced by a quali ed installer preferably NFI or WETT Canada certi ed as prescribed by the local jurisdiction It must be installed and operate...

Страница 32: ...MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com...

Отзывы: