Commissioning
❯
Before taking the unit into operation, check for
any damage. Damaged units must not be
used.
In many countries technical medical prod-
ucts and electrical devices are subject to
regular checks at set intervals. The owner
must be instructed accordingly.
❯
Turn on the unit power switch or the main
surgery switch.
❯
Carry out an electrical safety check in accor-
dance with applicable local regulations (e.g. the
German Ordinance on the Installation, Opera-
tion and Use of Medical Devices / Medizinpro-
dukte-Betreiberverordnung) and record the
results as appropriate, e.g. in the technical log
book.
9.1
Checking the switch-on/cut-
off pressure
The switch-on/cut-off pressure is preset at the
factory. Check the adjustment during first start-
up.
When the mains plug is connected the compres-
sor will start up after a delay of 10 s. If the com-
pressor was in standby mode before it was last
taken out of operation, then it will be in standby
mode again after the mains plug is connected.
❯
Read off the cut-off pressure from the pressure
gauge.
❯
Drain the air from the pressure tank (e.g. via
the condensate drain valve) until the unit starts
and then close it again.
❯
Read off the pressure when the unit starts up.
Result:
If the readings deviate from the values preset at
the factory, adjust the values to a different
required pressure if necessary.
9.2
Checking the safety valve
Correct operation of the safety valve must be
checked when the unit is started up for the first
time and again subsequently at regular intervals.
At the factory, the safety valve is set to
10 bar (1 hPa), checked and stamped.
Assembly
5286100072L02 1909V005
17
EN
Содержание 5286100036
Страница 1: ...EN Tornado 2 Installation and operating instructions 0297 5286100072L02 5286100072L02 1909V005 ...
Страница 2: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......