
Operation
Operating Instructions 512/532 - 05.0 - 04/2018
21
Insert a full bobbin
To insert a full bobbin:
1.
Insert the full bobbin into the bobbin housing upper section (2).
2.
Feed the hook thread through the bobbin housing slot (7)
under the tensioning spring (5) into the hole (4).
3.
Pull the hook thread approx. 2.5 cm out of the bobbin housing
upper (2).
The bobbin must rotate in the direction of the arrow when
pulling out the hook thread.
4.
Insert the bobbin housing upper (2).
5.
Close the hook cover (3).
Содержание 512/532
Страница 1: ...Operating Instructions 512 532 ...
Страница 6: ...Table of Contents 4 Operating Instructions 512 532 05 0 04 2018 ...
Страница 16: ...Safety 14 Operating Instructions 512 532 05 0 04 2018 ...
Страница 60: ...Programming 58 Operating Instructions 512 532 05 0 04 2018 ...
Страница 70: ...Maintenance 68 Operating Instructions 512 532 05 0 04 2018 ...
Страница 86: ...Decommissioning 84 Operating Instructions 512 532 05 0 04 2018 ...
Страница 88: ...Disposal 86 Operating Instructions 512 532 05 0 04 2018 ...
Страница 97: ...Appendix Operating Instructions 512 532 05 0 04 2018 95 11 Appendix ...
Страница 98: ...Appendix 96 Operating Instructions 512 532 05 0 04 2018 ...
Страница 99: ......