MAL_Vero_VE6414/15.04.1
1
2
3
4
Reference the washbasin
specification to establish the position
of mounting bolts, mark the holes
to be drilled for the anchors.
Using 3/8“ and 5/8“ drill bit,
drill the anchor holes that have
been marked.
The plastic anchors provided are
for concrete wall applications.
For wood stud walls, bolt should
be screwed into wood backing.
5
6
7
8
When mounting the washbasin
into a wood stud wall, there
must be adequate bracing.
We recommend doubling up
2 x 6’s or 2 x 8’s between
the studs to form a solid
anchoring point.
Screw mounting bolts into the
pre drilled holes with an
adjustable wrench.
Screw in the full length of the
mounting bolt, so that the lag
thread is no longer visible.
Carefully slide washbasin onto
the mounting bolts. Insert
the white plastic sleeve over
bolt and into the hole in the
washbasin.
Install provided washer and nut.
Hand tighten the nut, so the
washbasin is secure.
Install the siphon.
Remove the vanity drawers.
Push and lock in pins (1) and
remove the drawer. (2)
Attach the front legs.