Seitenansicht
Lateral view
150
> =
Gezeichnet
Drafted
Ge
Š
ndert
Modified
GeprŸft
Certified
Datum
Date
Name
Ma§stab
Scale
Name
Bezeichnung
Description
Artikel-Nr.
Model-No.
Technische Verbesserungen und optische Ver
Š
nderungen an den abgebildeten Produkten behalten wir uns vor.
We reserve the right to make technical improvements and enhance the appearance of the products shown.
1:20
1:10
1:5
X
# W-
T
-
Allgaier
000000 - 00 - 0
08.10.13
000000
Schematische Zeichnung mit Rohrunterbrecher
Zeichnung
Drawing
Spezial Ab-und †berlaufgarnitur mit Bodenzulauf
fŸr Badewanne
Special waste and overflow with base inlet
for bathtubs
WLT
08.10.13
Regarding the mounting instructions
These mounting instructions come as part of the Duravit
bathtub and should be read carefully prior to installation.
Explanation of the pictograms and symbols
DANGER!
At high risk of fatal hazards or
serious injuries
ADVICE!
In the case of potential damage to property
Link to the
Electrical Installation
section
Link to
installation information
in this section
Inspection (e.g. for scratches)
Indication of the length of time (e.g. 10 minutes)
Inspect to check for leaks and tightness
Indication of the temperature
Unit 1
Unit 2 (only with Combi systems)
Control unit
(Number depends on the whirl system)
Intake opening
Inspection hatches required
Target group and qualification
The whirltub must only be installed by trained plumbing
engineers. The electrical installation may only be carried
out by qualified electricians.
NOTE!
Local installation regulations and any country-
specific standards must be observed at all times.
Safety information
DANGER! Risk of fatal electric shock.
> Do NOT remove any whirltub components.
Installation information
Please read pre-installation datasheets prior to the
installation. These are available to download on the
Internet at www.duravit.com.
NOTE!
If the tray has a base inlet, a pipe interrupt must always
be installed on-site.
> See installation diagram.
10
Checking the whirl system (Diagram 10)
> Switch on the whirl system for 10 minutes: run
this through once completely in the case of
circuits with different levels of intensity.
> Leave the water in the bathtub and wait 10 minutes.
> Check to make sure that it is leak-tight.
> If adjustments are required, repeat the check.
11
Providing for an inspection hatch (Diagram 11)
Install the whirltub such that all vital assemblies
(pump, air blower and controls) remain accessible
> Providing for inspection hatches
ιϟ
Area: see page 64
ιϟ
Dimensions of the inspection hatches
for assemblies: min. 50 x 50 cm
for drain fittings: min. 20 x 20 cm
ιϟ
Sealed to avoid spray water
ιϟ
Only to be opened with a tool
12
Providing for an air supply (Diagram 12)
> Provide for an opening on the panel with an area
of approx.15 cm
2
(e.g. 3 x 5 cm or 2 x 7.5 cm) for
the air supply.
Important information
6
WH_M_Einbau_Fliesen_Oval/15.12.3
en
Содержание Happy D.2 760320
Страница 2: ...2 WH_M_Einbau_Fliesen_Oval 15 12 3 Happy D 2 760320 PuraVida 760184 Starck 760009 760011 ...
Страница 59: ...600 600 2250 0 1 2 L N PE II I 6 I II 59 WH_M_Einbau_Fliesen_Oval 15 12 3 ar ...
Страница 60: ... 760009 760011 760020 760184 760320 60 WH_M_Einbau_Fliesen_Oval 15 12 3 ...
Страница 61: ... 10 1 4 7 2 8 3 5 9 6 WH_M_Einbau_Fliesen_Oval 15 12 3 61 ...
Страница 62: ...10 13 11 14 12 15 62 WH_M_Einbau_Fliesen_Oval 15 12 3 ...