60
0
600
2250*
0
1
2
L
N
PE
Electrical installation
II
I
*
or the height of
the highest shower
head / water outlet
that is permanently
installed; depending
on which is higher
Safety areas in accordance with DIN VDE 0100-701
7xxxxx xx x xx xxx0: 50 Hz, 220 - 240 V AC
7xxxxx xx x xx xxx6: 60 Hz, 220 - 240 V AC
I
N
= 16 A
I
ǻ1
P$
Power supply
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line:
ιϟ
Pre-connect a separate fuse and residual
current operating device (RCD)
ιϟ
Pre-connect an all-pole separating main switch
outside the prescribed safety areas (0 - 2)
ιϟ
Allow the supply line to protrude by 3,000 mm
> Laying the potential equalisation cable:
ιϟ
Allow the cable to protrude by 3,000 mm
15
Connecting the whirltub (Diagram 15)
NOTE! Avoiding any malfunctions!
ιϟ
Do not fasten the cables together with cable ties.
ιϟ
Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
II
Connect the potential equalisation cable to the
whirltub.
WH_M_D-Code_Fliesen/17.04.3.
7
en
Содержание D-Code 70095 Series
Страница 2: ...D Code 7X0095 7X0096 7X0097 7X0098 7X0099 7X0100 7X0101 7X0137 7X0138 2 WH_M_D Code_Fliesen 17 04 3 ...
Страница 58: ... www pro duravit com WH_M_D Code_Fliesen 17 04 3 58 DU ...
Страница 59: ...600 600 2250 0 1 2 L N PE II I 59 WH_M_D Code_Fliesen 17 04 3 DU ...
Страница 60: ...60 WH_M_D Code_Fliesen 17 04 3 790125 7X0095 7X0096 7X0097 7X0098 7X0099 7X0100 7X0101 7X0137 7X0138 790126 ...
Страница 61: ...1 2 3 4 5 6 6 8 9 WH_M_D Code_Fliesen 17 04 3 61 10 140 70 140 Ø 10 ...
Страница 62: ...62 WH_M_D Code_Fliesen 17 04 3 17 16 15 14 13 12 11 10 18 ...
Страница 63: ...WH_M_D Code_Fliesen 17 04 3 63 22 24 21 20 19 23 26 25 27 ...