background image

5

4DT-33IK35VB

4DT-34IK35VB

Note: Diagrams & Illustrations Are Not to Scale. 

Note: Diagrams & Illustrations Are Not to Scale. 

Table 1 - Contents of Insert Kits

Part Number

Description

PLANNING YOUR INSTALLATION:

The DIRECT-TEMP Co-Linear Insert Kit was 

designed to be installed in an existing mason-

ry or factory-built chimney, and connected to a 

direct vent co-linear gas insert (see Figure 1) 

or other appropriate direct vent gas appliance.

It is important to carefully measure the 

length of flex needed to reach from the 

appliance outlet to the Co-Linear Cap.

If the flex length is too short, a Flex Coupler  

(Figure 3) will be needed to attach an addi-

tional length of flex liner.  On the exhaust side, 

high temperature silicone needs to be applied.   

If the flex length is too long, the liner could 

sag below the appliance outlet which 

could  result  in  a  portential  fire  hazard.

Flex Liner

Direct Vent 

Co-Linear Gas Insert

Figure 1

Insert Co-Linear Kit (3"/3") 

Includes: 

2 - 3" x 35' aluminum flex 

lengths, 

1 - Co-Linear Cap 3"/3", 

1 - Hardware pack (screws 

and hose clamps),

1 - Installation Instructions.

Insert Co-Linear Kit (4"/3") 

Includes: 

1 - 4" x 35' aluminum flex 

length, 

1 - 3" x 35' aluminum flex 

length, 

1 - Co-Linear Cap 4"/3", 

1 - Hardware pack (screws 

and hose clamps),

1 - Installation instructions.

surface damage, caution must be observed 

when lowering liner lengths into the masonry 

flue.

The top section of the masonry must be water-

tight to prevent moisture from entering the ma-

sonry chimney and causing damage.  Consult 

the local building authority for more information 

on how to seal the damages or unused masonry 

section.

Masonry Chimney Installation:

1. Measure the distance between the top of 

the masonry chimney and the gas appliance, 

allowing for any required bends. 

2. Select the lengths necessary to 

accommodate the required distance 

determined above.  Stretch the flexible liners 

to the desired lengths (requires 2 people) by 

placing both hands around the circumference 

of the ends of the liners and gently pulling.  

If any flexible liners requires cutting, use a 

sharp fine-toothed hacksaw.

3.  The exhaust flex length is identified with 

red tape at both ends.  Use the flex length 

with no red tape as the air intake flex length.  

If the flex liners are unidentified, mark each 

liner at the top and bottom as either exhaust 

or intake to prevent confusion later.

4.  Insert a rope through the end of the Pull-

Down and tie a knot at the end of the rope. 

Attach the Pull-Down to the Flex Liner using 

four sheet metal screws as shown (Figure 2).  

Carefully feed the liner down the chimney 

(Figure 4) one at a time (masonry or factory-

built) and out through the damper. 

Hose Clamps

Sheet Metal 

Screws

Содержание DIRECT-TEMP Co-Linear Insert Kit

Страница 1: ...n Instructions Venting System For Direct Vent Co Linear Gas Inserts LISTED MH27778 Co Line ar Insert Kit Selkirk Direct Vent System 2022 DIRECT TEMP Form No L950_820019494 Installation Instructions 11 08 2022 Printed in U S A ...

Страница 2: ...tions of certification and may affect your homeowner s insurance and safety listing of your appliance APPLICATION This instruction applies to the Selkirk Direct Temp termination system and is intended as a supplement to the applicable Direct Temp Instructions This termination and venting system in combination with the gas appliance has been tested and listed by an accredited test agency Check the ...

Страница 3: ...3 MH27778 Note Diagrams Illustrations Are Not to Scale CERTIFICATION LABEL ...

Страница 4: ...ght as possible avoid unnecessary bending Due to possible snagging which may result in some Failure to follow the installation instructions could cause FIRE CARBON MONOXIDE POISONING OR DEATH If you are unsure of installation requirements call the Phone Number listed on the instructions or visit www selkirkcorp com WARNING Selkirk DIRECT TEMP Colinear Insert Kit provides a Vertical Cap with a buil...

Страница 5: ...nstructions surface damage caution must be observed when lowering liner lengths into the masonry flue The top section of the masonry must be water tight to prevent moisture from entering the ma sonry chimney and causing damage Consult the local building authority for more information on how to seal the damages or unused masonry section Masonry Chimney Installation 1 Measure the distance between th...

Страница 6: ...lly feeding the Flex Liner down the chimney to the bottom form an angle to line up the Flex Liner with the vent opening on the appliance Important Do not let the Flex Liner sag below the level at which it will connect to the appliance or connector This could allow hot gas to become trapped and potentially become a fire hazard The Flex Liner path should always be sloped up toward the Co Linear Cap ...

Страница 7: ...o Linear High Wind Cap Baseplate Sheet Metal Screws Figure 7 10 Apply a bead of silicone sealant to the top of the masonry chimney prior to securing the baseplate of the Co Linear High Wind Cap to the masonry chimney Secure Co Linear High Wind Cap to masonry chimney with suitable fasteners one at each corners and cover the heads with silicone sealant Figures 6 7 11 Connect both of the flex directl...

Страница 8: ...ppear as rust spots or streaks and in extreme cases holes These compo nents should immediately be replaced 2 Remove the cap and remove any bird nests or other foreign material 3 Check for evidences of excessive con densate such as water droplets forming in the liners and subsequently dripping out at joints Continuous condensate can cause corrosion of caps liners and fittings It may be caused by ha...

Страница 9: ...tion pour les encastrables colinéaire à gaz d évacuation directe Kit colinéair e pour encastrab le Système d évacuation directe de Selkirk HOMOLOGUÉ MH27778 2022 DIRECT TEMP No Formulaire L950_820019494 Instructions d installation 11 08 2022 Imprimé aux É U ...

Страница 10: ...eut affecter votre assurance d habitation et la conformité de votre appareil aux normes de sécurité Ces directives s applique au système de terminaison Selkirk Direct Temp et destinée à compléter les instructions Direct Temp correspondantes Ce système de terminaison et d évacuation en combinaison avec l appareil à gaz a été testé et répertorié par une agence de test accréditée Vérifiez la plaque s...

Страница 11: ...3 MH27778 Note Les schémas et illustrations ne sont pas à l échelle ÉTIQUETTE DE CERTIFICATION ...

Страница 12: ...ndant gardez la gaine flexible aussi droite que possible éviter les courbures inutiles Le non respect des instructions d installation pourrait provoquer UN INCENDIE UN EMPOISONNEMENT AU MONOXYDE DE CARBONE OU LA MORT Si vous avez quelques incertitudes concernant les exigences d Installations composer le numéro indiqué dans les instructions ou consulter notre site web au www selkirkcorp com AVERTIS...

Страница 13: ...areil et pourrait en conséquence être un risque d incendie Kit encastrable 3po 3po contient 2 Longueurs 3po x 35pi 1 Capuchon colinéaire 3po 3po 1 Quincaillerie vis et colliers de serrage 1 Instructions d installation Kit encastrable 4po 3po contient 1 Longueur 4po x 35pi 1 longueur 3po x 35pi 1 Capuchon colinéaire 4po 3po 1 Quincaillerie vis et colliers de serrage 1 Instructions d installation De...

Страница 14: ...la cheminée jusqu en bas former un angle pour aligner le conduit flexible avec l ouverture de l appareil Important Ne pas laisser le conduit fléchir au dessous du niveau auquel il se reliera à l appareil ou au connecteur Ceci pourrait permettre au gaz chaud d être piégé et de devenir potentiellement un risque d incendie La route du conduit flexible devrait toujours être inclinée vers le haut en di...

Страница 15: ...on à grand vent colinéaire Plaque de base Vis à métaux Schéma 7 10 Appliquez un ruban de scellant à la silicone sur le dessus de la cheminée de maçonnerie avant de sécuriser la plaque de base du capuchon à grand vent colinéaire à la cheminée Appuyer fermement sur la plaque de base et sécuriser en place à l aide d attaches appropriées une à chaque coin et couvrez les têtes avec un silicone shémas 6...

Страница 16: ...ent im médiatement être remplacées 2 Retirer le capuchon et vérifier qu il n y a au cune obstruction pouvant empêcher la sortie des gaz ou l entrée d air Enlever tous les nids d oiseau et toute autre obstruction 3 Vérifier que l intérieur du conduit flexible ne comporte aucune infiltration d eau telles que les évidences de condensation excessive s égouttant plus tard hors des joints La con densati...

Отзывы: