Riverlea Group Ltd warrant that the cladding used in the manufacture of the Sentry shed will not rust within 20 years from the date 

of purchase. 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges. 

 

 

This warranty is conditional on: 



Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual. 



The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          

(as published by Branz). 



Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase.  

 

 

This warranty does not cover the following: 



Fastenings and fixings. 



Normal wear and tear, damage by impact or acts of God. 



Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 



Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty-garden-sheds to validate the Warranty on your shed. 

Click on the Warranty Registration Link and complete all details. 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed.  

 

 

Many thanks, from the Team at Riverlea Group. 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Содержание SG2525

Страница 1: ...ASSEMBLY INSTRUCTIONS SG2525 BASE SIZE 2 520m x 2 520m ...

Страница 2: ......

Страница 3: ... REQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits Volcanic Ash Fallout wash as soon as possible removing fall out from roof and gutters Do ...

Страница 4: ...m Measurement along centre of sheet 2 Barge 1 350 m 4 Roof 1 350 m 10 Ridge Flashing 1 555 m 2 Door 3 4 Sheet 1 810 m 2 Padbolt Support 0 140 m 1 TIMBER Spouting 2 555 m 2 Bottom Plates H4 Green Front Back 2 520 m 2 HARDWARE Bottom Plates H4 Green Sides 2 520 m 2 Hardware Pack 1 Top Plate H1 Red Front Back 2 520 m 2 Paint Brush 1 Top Plate H1 Red Sides 2 520 m 2 Ridge Beam H1 90 x 45 2 520 m 1 Jac...

Страница 5: ...m Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF 8 SECURE SHED 4 ASSEMBLE BACK PANEL 3 ASSEMBLE SIDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW ...

Страница 6: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate and the concrete floor See note on page 7 80mm 100mm 7 5mm 20mm Concrete Floor Base Plate Wall Cladding 5 RAISED BASE PLATE OPTION For sheds placed on a raised concrete floor No doubt by now you...

Страница 7: ... flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 4 and opposite ends of the braces overlap in the middle Rivet door brace flashings onto back of door as shown Where possible rivet from front of door fig 1 ...

Страница 8: ...wn STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Std Shed Bottom Plate will protrude below wall sheet by approximate...

Страница 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top and Bottom Plates is correct As shown Check that the Bottom Plate is straight then nail wall sheets to the Bottom Plate using two clouts per pan Std Shed Bottom Plate will protrude below wall she...

Страница 10: ...Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the Bottom Plate making sure that...

Страница 11: ...ng someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel Ensure that the Front Wall Sheets over...

Страница 12: ...Studs into the Timber Top Plate fig 2 Check that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE RIDGE BEAM SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE STEP 2 Position the f...

Страница 13: ...ATE STEP 3 Position 1 x roof sheet so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top Plate by 15mm Ensure the Ridge Beam and the Top Plate are straight Nail 4 x corners of the Roof Sheet as shown ensuring the ribs on the Roof Sheet line up with the front Roof Sheet and the back Wall Sheet Nail off the first sh...

Страница 14: ...ets evenly around the shed and fix to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Plate measurements are the same Place the floor boards in position and nail sec...

Страница 15: ......

Страница 16: ... less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact or acts of God Situations where the shed has been used for storage of chemicals manure or corrosion causing products Unauthorized modification o...