TOP PLATE 

TOP PLATE 

ASSEMBLE FRONT PANEL 

BOTTOM PLATE 

1811mm 

1811mm 

15mm 

15mm 

15mm 

15mm 

530mm 

960mm 

TOP PLATE 

DOOR OPENING 

x3 

SELECT: 
 
3 x 1.850 Wall Sheets 
1 x 2.520 Top Plate (Red) 
1 x 2.520 Bottom Plate (Green) 
2 x 1.850 Door Jamb Flashings 
40 x 30mm Galv Clouts 
19 x Rivets 

STEP 1: 

 



Lay out 1 x Top Plate and 1 x Bottom Plate on a flat 
surface as shown  

STEP 2: 

 



Using 2 x 30mm clouts, nail the Door Jamb Flashing flush with 
the top of the Top Plate at the correct  measurement as shown 
in plan view. Pre drill holes using a 3.5mm drill bit. 

 



Check the distance between the top and bottom plates then use 
a further 2 x 30mm clouts to nail the Door Jamb Flashings to 
the bottom Plate. Pre drill holes. 

NOTE: 

Door can be hinged on either side. 

STEP 4: 

 



Place the door on the panel (In open position, approx 
20mm below top of top plate). Using two rivets, rivet the top 
and bottom hinges to the Door Jamb Flashing, ensuring 
door closes properly.  

 



Fit remaining rivets. 

STEP 3: 

 



Place 3 x Wall Sheets on timber plates and rivet the sheets 
together as shown. 

 



Ensure that the top of the sheet is flush with the top of the 
Top Plate and that the sides of the wall sheet overhang the 
Top Plate by 15mm as shown. Nail wall sheets to Top Plate 
(two clouts per pan). 

 



Nail the wall sheets to the Bottom Plate making sure that the 
Plates are the correct distance apart and that the sides of the 
wall sheets overhang the Bottom Plate by 15mm

 



Drill & rivet Door Jamb Flashings to wall sheets using four 
rivets equally spaced on each side. 

NOTE: 

The Doorway is standard at 530mm from left-hand end. 

To shift the doorway to the right-hand side of the front 
wall, simply measure 530mm from the right-hand end.

 

Plan View 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 
BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 
30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

TOP PLATE 

TOP 

PLATE 

DOOR 

JAMB 

NAIL 

x3 

x3 

Содержание SG2525

Страница 1: ...ASSEMBLY INSTRUCTIONS SG2525 BASE SIZE 2 520m x 2 520m ...

Страница 2: ......

Страница 3: ... REQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits Volcanic Ash Fallout wash as soon as possible removing fall out from roof and gutters Do ...

Страница 4: ...m Measurement along centre of sheet 2 Barge 1 350 m 4 Roof 1 350 m 10 Ridge Flashing 1 555 m 2 Door 3 4 Sheet 1 810 m 2 Padbolt Support 0 140 m 1 TIMBER Spouting 2 555 m 2 Bottom Plates H4 Green Front Back 2 520 m 2 HARDWARE Bottom Plates H4 Green Sides 2 520 m 2 Hardware Pack 1 Top Plate H1 Red Front Back 2 520 m 2 Paint Brush 1 Top Plate H1 Red Sides 2 520 m 2 Ridge Beam H1 90 x 45 2 520 m 1 Jac...

Страница 5: ...m Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF 8 SECURE SHED 4 ASSEMBLE BACK PANEL 3 ASSEMBLE SIDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW ...

Страница 6: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate and the concrete floor See note on page 7 80mm 100mm 7 5mm 20mm Concrete Floor Base Plate Wall Cladding 5 RAISED BASE PLATE OPTION For sheds placed on a raised concrete floor No doubt by now you...

Страница 7: ... flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 4 and opposite ends of the braces overlap in the middle Rivet door brace flashings onto back of door as shown Where possible rivet from front of door fig 1 ...

Страница 8: ...wn STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Std Shed Bottom Plate will protrude below wall sheet by approximate...

Страница 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top and Bottom Plates is correct As shown Check that the Bottom Plate is straight then nail wall sheets to the Bottom Plate using two clouts per pan Std Shed Bottom Plate will protrude below wall she...

Страница 10: ...Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the Bottom Plate making sure that...

Страница 11: ...ng someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel Ensure that the Front Wall Sheets over...

Страница 12: ...Studs into the Timber Top Plate fig 2 Check that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE RIDGE BEAM SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE STEP 2 Position the f...

Страница 13: ...ATE STEP 3 Position 1 x roof sheet so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top Plate by 15mm Ensure the Ridge Beam and the Top Plate are straight Nail 4 x corners of the Roof Sheet as shown ensuring the ribs on the Roof Sheet line up with the front Roof Sheet and the back Wall Sheet Nail off the first sh...

Страница 14: ...ets evenly around the shed and fix to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Plate measurements are the same Place the floor boards in position and nail sec...

Страница 15: ......

Страница 16: ... less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact or acts of God Situations where the shed has been used for storage of chemicals manure or corrosion causing products Unauthorized modification o...