background image

29

29

GUARANTEE TO CUSTOMER

Congratulations on purchasing a Duratuf Storage Shed. With proper care and attention, this product will last any years.

For your benefi t 

PLEASE READ THE FOLLOWING INFORMATION CAREFULLY.

WARRANTY ON METAL CLADDING

Riverlea Group Ltd guarantee that the metal roofi ng and wall cladding on Kiwi and Fortress Garden Sheds may be used in moderate and inland corrosion zones or areas where the fi rst year mild steel corrosion rate 

is less than 200g/m2, and that in these conditions, they will not perforate due to corrosion within 18 years of date of manufacture.

TERMS AND CONDITIONS

 

1.  Damage or corrosion due to the following circumstances is not covered by this warranty.

 

 

•   

Mechanical, chemical or other damage sustained during or after installation.

   

 

NOTE

: Clean swarf off  shed 

IMMEDIATELY

 after assembly

   

  Do 

NOT

 mark cladding with pencil

  

Do 

NOT

 allow manures, chemicals or other corrosive materials to have direct contact with cladding

  • 

Force majeure or other causes beyond the control of Riverlea Group Ltd.

 

2.  This warranty does not cover material installed in severe and very severe environmental situations, or in any area where the mild steel corrosion rate (as published by BRANZ) exceeds 200g/m2.

 

3.  Minimum maintenance must be carried out in accordance with instructions below.

Should the cladding fail to perform as specifi ed above, the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the defective product. The balance of the original warranty will cover any 

repaired or replaced material. Riverlea Group Ltd will not be liable for any consequential loss or damage, labour or transport charges. All claims made in writing within 21 days of discovery, quoting the reference 

number at the top right hand corner of this page.

MAINTENANCE

Following are the minimum maintenance requirements for cladding used in Kiwi Garden Sheds and Fortress Sheds.

 

• 

Washing all surfaces by rain, and annual hosing of sheltered areas using a hose and soft nylon brush.

 

• 

Within 2km of coast—wash every 3 months as above. After a storm, wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits.

 

• 

Volcanic Ash Fallout—wash as soon as possible, removing fallout from roof and gutters.

 

• 

Gutters to be kept clean of leaves and dirt.

Should you require additional technical information please contact us at the details below.

Please visit http://www.riverleagroup.co.nz/warranty-garden-sheds to validate the Warranty on your shed.

Click on the Warranty Registration Link and complete all details.

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team will help you to acti-vate the warranty on your garden shed.

Many thanks, from the Team at Riverlea Group.

DURATUF PREMIUM SHED WARRANTY

WARRANTY REGISTRATION

Содержание Ponsonby

Страница 1: ...ASSEMBLY INSTRUCTIONS BASE SIZE 2 400m x 1 000m PONSONBY...

Страница 2: ...se electronic tools with care Use a Safety Trip Switch It is easier and quicker if this shed is erected by two people SELECT YOUR SITE Your shed must be level Achieve this by either levelling the grou...

Страница 3: ...1 000m 2 Lintel 45 x 45 H1 1 800m 1 Stud 45 x 45 H1 Yellow 2 295m 9 Stud 45 x 45 H1 Yellow 0 320m 2 Top Plate Packer 45 x 45 H1 2 400m 1 Nog 45 x 45 H1 0 910m 2 Nog 45 x 45 H1 1 132m 2 Nog 45 x 45 H1...

Страница 4: ...m 110 Clouts 50mm 12 Rivets 3 2mm 60 Roll of DPC 75mm wide 30m 1 Touch up paint and brush 1 DESCRIPTION LENGTH QTY PART DIAGRAM CHECKED Corner Flashing 2 364m 4 1001 Door Top Flashing 1995m 1 1002 Doo...

Страница 5: ...reated 2 400m x 0 955m 1 Plywood 17mm treated 0 165m x 0 045m 2 Joists 45 x 45 H4 2 310m 1 Joists 45 x 45 H4 0 865m 2 Aluminium Door Step Flashing 1 795m 1 Floor Screws 40mm 30 Floor Screws 75mm 15 DE...

Страница 6: ...ller than the shed frame size which allows for a 10mm gap around the perimeter of the shed Concrete base to be a minimum of 80mm thick and at least 100mm thick around the perimeter Base should be at l...

Страница 7: ...x 1132mm Nogs Select one 2400mm base plate Green one 2400mm top plate Red and three studs Yellow Lay out plates and three studs on a flat surface ensuring notches face outwards as shown Nail together...

Страница 8: ...ct position Nail remaining two studs to inside of studs and top and bottom plates to make a double stud each side of doorway opening Nail lintel to studs using the 320mm studs to establish correct hei...

Страница 9: ...ce the frame before rolling it over Position 910mm end wall nogs at correct height and nail in place The roof can slope either direction either falling to the front or falling to the back Determine wh...

Страница 10: ...as an optional plywood floor fit floor now Using a hand saw remove base plate between door studs by cutting flush with inside of door studs as shown Using four 75mm screws screw 2310mm floor joist to...

Страница 11: ...ase and is positioned directly on the ground you wont need to attached DPC on the base plate Using ten 30mm clouts attach 75mm wide DPC membrane to each corner as shown DPC should be level with top of...

Страница 12: ...filings between two sheets Remove all metal filings before riveting Carbon in pencils reacts with the Zinc Aluminium coating on steel Use ink to mark steel CLADDING DETAIL Side View CLADDING DETAIL O...

Страница 13: ...eet to frame Note screw approx 25mm back from end of sheet Corner flashing will cover screws when attached Repeat at the other end ensuring top of sheet is flush with top of top plate Screw sheet near...

Страница 14: ...oor jamb flashing so top is level with underside of lintel Using tin snips knotch bottom of flashing around concrete or ply floor if required Attach using three 30mm clouts nailed to inside of stud an...

Страница 15: ...sition of downpipe and mark a 30mm diameter hole in underside of spouting Note hole needs to be centrally above corner flashing and can be at either end Mark a 30mm diameter hole ensuring hole is as c...

Страница 16: ...at using one 50mm clout predrill and nail roof sheet to upper top plate through rib of corrugate ensuring edge of sheet is 10mm in from the timber frame Note Use tek screws on lower edge of roof sheet...

Страница 17: ...ing two rivets rivet ridge to corner flashing Push soft edge down into roof corrogations to prevent water penetrating under the ridge flashing Position barges as shown using six rivets rivet barge to...

Страница 18: ...hand side C 2 Steel locking bars D 2 SMALL PARTS BAG CONTAINING Guide clips door size dependent E 4 10 Door handle and fixing to suit F 1 Bottom rail stops and 6mm screws G 2 Faceplate and lock assemb...

Страница 19: ...sed across the opening to avoid gaps MEASUREMENTS Opening width As the standard door overlaps each side by 30mm or more the door should be 60mm wider than the 1800mm opening Opening height The door op...

Страница 20: ...with handle 80 80 HEADROOM REQUIREMENTS FOR DOORS Headroom A minimum of 410mm of headroom is required If the door is installed lower into the opening than shown below additional loss of door opening...

Страница 21: ...second bracket Re check levels then drill and fix as with first bracket PLACE DOOR ON BRACKET Do not cut plastic or packaging yet Using two persons and correct lifting techniques lift door onto the br...

Страница 22: ...h the axle forward in the slots toward the opening and tighten the nuts firmly without overtightening TENSION THE SPRINGS Ensure that the bottom rail is at the 3 o clock position as shown Ensure both...

Страница 23: ...that is level with the brackets B Slide four guide clips E into each guide C Position the bottom clip 200mm from the floor with the rest evenly spaced along the guide Position one guide over the edge...

Страница 24: ...ith top of locking bar Slide bars through the guide slot then back onto lock arms Screw on securely using the counter sunk screws O Ensure that locking bars do not protrude more than 20mm beyond guide...

Страница 25: ...Lock bar cover J WARNING Locking bar covers must be installed to prevent possible finger entrapment CLEAN UP Remove all swarf drill filings with a soft brush or rag Hose down roof and walls thoroughl...

Страница 26: ...caution b With a person at each end of the door hold the axle firmly with a large pip wrench Stillson at least 450mm long c Loosen the U bolt nuts at both ends and KEEP A FIRM GRIP ON WRENCH d Move th...

Страница 27: ...ercially available today However all exposed surfaces require some attention to guard against the premature onset of corrosion and any other harmful atmospheric effects In our atmosphere there are har...

Страница 28: ...ose the door should be about the same if door has an automatic opener put into manual mode before testing door If the door is difficult to operate in either direction up or down then check 1 that the...

Страница 29: ...ding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the defective product The balance of the original warranty will cove...

Отзывы: