16
Step 2:
Once door is hung, position the Locking Stays so
they slide into the Locking Brackets easily. Screw
Locking Stays to Door Jamb.
SECURITY DOOR
(Optional)
Step 3
On the left hand Door Jamb, position latch so that
the hook on the door handle will be secure and go
in and out easily. Rivet in place with four rivets.
RAISED FLOOR MODIFICATION
For sheds being placed on a purpose built floor, (concrete, cob-
bles, ply etc.), the Wall Sheets will protrude 20mm below the
Base Plate. This will stop water flowing in between the Base
Plate and Floor.
The Floor should be made 15mm smaller than Base Size.
Note:
Although it is not essential, fitting Damp Proof Course
in between the Base Plate and the Floor will give add-
ed protection against moisture.
CLEAN UP
•
Remove all swarf
(drill filings) with a soft brush or rag.
•
Hose down roof and walls thoroughly.
•
For Coloursteel sheds use touch
-
up paint provided on all nail heads, rivets and exposed cuts.