Duratuf KIWI KL1 Скачать руководство пользователя страница 8

8

 

KL1 WINDOW (Optional)

 

Step 2:

 

On  the  inside  of  the  shed,  position  studs 
and  Nog  centrally  on  window  opening. 
Make  sure  the  studs  are  parallel  and  nail 
into Top Plate and End Wall Nog.

 

Step 3:

 

Nail  wall  Sheets  to  window  framing  using 
30mm  clouts.  (return  to  step  4  on  page  7 
and  complete).  Then  fit  Window  Frame). 
Position  Window  Frame  centrally  on  win-
dow  opening  and  rivet  it  to  ribs.  Pre

-

drill 

holes  in  each  corner  and  nail  Window 
Frame to framing, using 50mm nails.

 

588mm

 

Step 1:

 

Lay out the two window studs (883mm) and 
Nog  (634mm)  on  a  flat  surface.  Position 
Nog and nail in place using 2x 75mm nails 
at each end.

 

Step 6:

 

From  the  inside  of  the  shed,  slide  Louvre 
Glass  into  Louvre  Units  attached  to  the 
Window  Frame.  Bend  up  tabs  to  keep 
Glass in position.

 

570mm

 

Step 6:

 

From  the  outside  of  the  shed,  place  glass 
in  Window  Frame.  Attach  a  Glazing  Bead 
(G100) with three rivets to each side of the 
Window Frame to hold glass in place. Pre

-

drilling Glazing Beads is recommended.

 

Step 1:

 

Lay out the two window studs (883mm) and 
Nog  (590mm)  on  a  flat  surface.  Position 
Nog and nail in place using two 75mm nails 
at each end.

 

FIXED WINDOW

 

LOUVRE WINDOW

 

50mm

 

NAILS

 

RIVITS

 

Содержание KL1

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KL1 BASE SIZE 1715mm x 1210mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...580m 0 603 x 0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 450m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed lig...

Страница 4: ...RAME 4 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 1120 1210 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785 1900 or 1870 for Raised Base Plate only 1945 or 1915 for Raised Base...

Страница 5: ...p 3 Select one 1 715m Base Plate Green and the Ridge Beam 90 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and Base Plate Green are on the...

Страница 6: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 7: ...th the LIP on the right hand side Over lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan in...

Страница 8: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 9: ...lashing 106 to fit in between Door Jambs Position the Door step Flashing in between the Door Jambs at bottom of doorway nail through top of flashing using three 30mm Clouts Repeat with the Overdoor Fl...

Страница 10: ...f the Door Guide 20mm in from outside of the right hand corner flashing Step 6 Lift the door guide up approximately 3mm so that the Door will Slide freely Pre drill a hole through the door guide and t...

Страница 11: ...ground it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position roof so that the front overhang measures 140mm Line up Ribs on the Roof Sheets with R...

Страница 12: ...to the Barge Flashing at each end Repeat with other Spouting Step 2 Centralise Barge Flashing on end and rivet in place one rivet into every second Rib Fit two rivets through top of Barge into Rib Re...

Страница 13: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 14: ...ote See below for security option 14 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brack ets easily Screw Locking Stays to Door Jamb Step 1...

Страница 15: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give added protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or r...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: