Duratuf KIWI KL1 Скачать руководство пользователя страница 10

10

 

KL1 DOOR

 

Step 1:

 

Position Door Track (107) on the front wall 45mm down 
from  underside  of  Roof,  with  right  hand  end  20mm  in 
from  outside  edge  of  right

-

hand  corner  flashing.

 

Pre 

-

  drill  hole  in  centre  of  track  and  screw  in  place

 

 using, one 45mm door track screw. 

 

 

Remove ALL drill filings.

 

Note:  Ensure  Door  Track  screws  are  screwed  in  horizontal    and 

screwed  hard  into  flashing.  Protruding  screw  heads  can 
cause door rollers to bind on the screw heads.

 

Step 2:

 

Hang door in the Door Track. At the right hand end of 
Door Track, adjust up or down so that the Door hangs 
parallel  with  shed.  Fit  one  rivet  at  right  hand  end  to 
hold in place. Repeat with left hand end of track.

 

Note: Only use rivets at each end of track.

 

Step 3:

 

Remove  the  Door.  Pre

-

drill  and  screw  another  2 

screws  between  centre  screw  and  the  rivets  at  each 
end  (5  screws  per  track).  Screw  track  using  45mm 
door track screws.

 

KL1 DOOR

 

Step 5:

 

Bottom  Door  Guide:  Slide  the  Door  to  the  corner  of  the  shed. 
Place    the  Door  Guide  (108)  over  the  Guide  Brackets  on  the 
door and align the end of the Door Guide 20mm in from outside 
of the right

-

hand corner flashing. 

 

Step 6:

 

Lift the door guide up approximately 3mm so that the Door will 
Slide freely. Pre

-

drill a hole through the door guide and the end 

rib of the cladding and screw in place using a 45mm screw. 

 

Step7:

 

Slide the door to the centre, ensuring that it slides freely. Pre

-

drill and insert a screw in the other end of the Door Guide. 
Check that the Door is not binding in the middle then pre

-

drill 

and fix with 3 more screws, one in the centre of the guide and 
the other 2 evenly spaced between (5 screws per guide)  into 
the door step flashing and rib.

 

Note:

 

For sheds with Raised Base Plate option the Door Step Flash-
ing will protrude down past the Bottom Plate.

 

Attach Door Guide with rivets.

 

DOOR

 

GUIDE   

 

DOOR       

 

CLADDING

 

BOT-

PLATE

 

GUIDE BRACKET

 

Step 4:

 

Clean  out  ALL  drill  filings.  Also  make  sure  the  Wheels  are 
cleaned of drill filings. Re

-

hang Door. 

 

 

Door Stops: Predrill a hole  in right

-

hand end of track,45mm 

in from outside edge of Corner Flashing. 

 

 

Predrill  hole  in  left

-

hand  end  of  track,  45mm  from  outside 

edge of corner flashing. 

(60mm for Security door option.)

 

 

Screw door stops in  using 1 x Roofing screw per stop.

 

 

Check door doesn't protrude past outside edge of shed.

 

Содержание KL1

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KL1 BASE SIZE 1715mm x 1210mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...580m 0 603 x 0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 450m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed lig...

Страница 4: ...RAME 4 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 1120 1210 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785 1900 or 1870 for Raised Base Plate only 1945 or 1915 for Raised Base...

Страница 5: ...p 3 Select one 1 715m Base Plate Green and the Ridge Beam 90 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and Base Plate Green are on the...

Страница 6: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 7: ...th the LIP on the right hand side Over lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan in...

Страница 8: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 9: ...lashing 106 to fit in between Door Jambs Position the Door step Flashing in between the Door Jambs at bottom of doorway nail through top of flashing using three 30mm Clouts Repeat with the Overdoor Fl...

Страница 10: ...f the Door Guide 20mm in from outside of the right hand corner flashing Step 6 Lift the door guide up approximately 3mm so that the Door will Slide freely Pre drill a hole through the door guide and t...

Страница 11: ...ground it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position roof so that the front overhang measures 140mm Line up Ribs on the Roof Sheets with R...

Страница 12: ...to the Barge Flashing at each end Repeat with other Spouting Step 2 Centralise Barge Flashing on end and rivet in place one rivet into every second Rib Fit two rivets through top of Barge into Rib Re...

Страница 13: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 14: ...ote See below for security option 14 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brack ets easily Screw Locking Stays to Door Jamb Step 1...

Страница 15: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give added protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or r...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: