ASSEMBLE AND INSTALL SECTIONS
STEP A5: INSERT PICKETS
Starting on one end, insert picket A with tabs all facing in the same direction down through the top-rail and into bottom rail
routed holes. The picket tab will securely lock the picket to the bottom rail when in place together. Continue across the
panel inserting the remaining pickets B to H.
(Fig. A4).
Fig.A3
Fig.A4
Property of Duramax Building Products © September 2021
Top Rail
smaller routed holes
facing towards the sky
Picket Caps
Bottom Rail with
Steel Insert
Picket Tab
Top Rail
Post
STEP A4: INSTALLING TOP RAIL
Slide top-rail into post top routed hole on one side then slide to the adjacent top hole post routed hole (Fig. A3).
NOTE:
The top-rail will have routed holes on the top and bottom of the rail. The larger routed holes should face
towards the ground (Fig. A3b).
Fig.A3b
larger routed holes
facing
towards the ground
Post
Post Top Routed Hole
Top Rail
larger routed holes
facing toward the ground
Picket Tab locks
picket and rail
together
A
Pickets
B C
D
E
F
G
H