ASSEMBLE AND INSTALL SECTIONS
STEP A3: INSTALL BOTTOM RAIL
Steel Reinforcement Channel
(AS AN OPTIONAL ITEM ON CERTAIN FENCING PRODUCT
ITEM MODEL)
need to be inserted first to the rail before installing the bottom rail
(Fig.
A2B).
Slide the bottom rail (with the steel insert)
(A)
, slots side up into the bottom hole of the
post. Starting at end or corner place the next post into the next hole. Now slide the next
Bottom Rail into the bottom hole of the next post
(Fig. A2)
. Repeat these steps until all
rails are inserted
(B)
..
Fig.A2
Fig.A2B
Fig.A1
STEP A2: LAYOUT PICKETS
Layout on a clean flat surface all the pickets as shown in
(Fig.A2)
.
Pickets
A
(2) 7∕8” x 3” x 44”
E
(2) 7∕8” x 3” x 39 3⁄₈”
B
(2) 7∕8” x 3” x 42 ¾”
F
(2) 7∕8” x 3” x 38 3⁄₈”
C
(2) 7∕8” x 3” x 41 ½”
G
(2) 7∕8” x 3” x 37 ½”
D
(2) 7∕8” x 3” x 40 3⁄₈”
H
(2) 7∕8” x 3” x 37”
Fig.A2
STEP A1: INSTALL PICKET SPADE CAPS
Apply a small amount of PVC glue to the inside edges of
then insert on the un-notched side of the picket by tapping
lightly on top of the cap until a tight fit between the cap and
picket. Wipe off any pvc glue residue
(Fig.A1)
.