Configuration, installation, commissioning
If there is not enough space available, the upstream section (A) should be
longer than the downstream section (B) in the ratio 2:1.
6.3 Installation
6.3.1 Weldingin the flange
The welding in of a welded-in flange is different in a vertical flue from a
horizontal flue. The red dot (arrowed in the graphic) must
always
be in the
upper position. For a system that has been correctly configured and installed
the red dots on the probe flange and the welded-in flange should be alongside
each other in the upper position.The flange projects 30 mm into the interior of
the duct (see diagrams).
D
−
R 800
53
76
70 mm
M10
L1
30
84...88°
130 mm
dr80
0_1
3_0
02
45°
Figure 6.5: Welding-in drawing D
−
R 800 for a horizontal duct
45°
130 mm
d
r800
_1
4_0
02
76
70 mm
M10
L1
30
84...88°
Figure 6.6: Welding-in drawing D
−
R 800 for a vertical duct
Содержание D-R 800
Страница 8: ......
Страница 10: ......
Страница 14: ......
Страница 16: ......
Страница 24: ......
Страница 28: ......
Страница 30: ......
Страница 40: ......
Страница 46: ......
Страница 64: ......
Страница 66: ......
Страница 84: ...Modbus 84 D R 800 ...
Страница 94: ......
Страница 96: ......
Страница 130: ......
Страница 136: ... Technical data 136 D R 800 ...
Страница 137: ... Menu structure D R 800 137 11 Menu structure Figure 11 1 Menu structure D R 800 part 1 3 ...
Страница 138: ... Menu structure Figure 11 2 Menu structure D R 800 part 2 3 138 D R 800 ...
Страница 139: ... Menu structure D R 800 139 Figure 11 3 Menu structure D R 800 part 3 3 ...
Страница 140: ... Menu structure 140 D R 800 ...
Страница 142: ......
Страница 144: ...Declaration of Conformityand QAL1 Figure 13 2 QAL1 to DIN EN 14181 and DIN EN 14956 page 1 2 144 D R 800 ...
Страница 145: ...Declaration of Conformityand QAL1 D R 800 145 Figure 13 3 QAL1 to DIN EN 14181 and DIN EN 14956 page 2 2 ...
Страница 148: ...Glossary 148 D R 800 ...
Страница 154: ...GmbH Kollaustraße 105 22453 Hamburg www durag de ...