background image

4.

 

Back Panel

: The back panel should be installed next.  Stand up the panel and position it on the 

other end of the wall and attached it using (5) pan head screws.  You should now have a frame, 
a wall, and a back panel standing ready for the next wall. 

 

 

5.

 

Interior Wall

: Locate a galvanized (non-painted) interior wall.  Position the wall between the 

frame and back panel you have already setup.  Now insert a splice plate between the frame and 
wall (this links the lockers in the bank giving them more stability/rigidity) and secure the wall to 
the frame using (5) pan head screws.  Next secure the wall to the back panel using (5) pan head 
screws, insuring both splice plates are aligned and sandwiched between the panels. 

 

 

6.

 

Top

: The locker top can now be installed (we recommend using two people to carry these 

panels as they are very heavy) lift the top over the frame, back panel, and walls you have 
assembled in the previous steps.  Slide a splice plate between the top and wall (this supports the 
top of the next locker in the bank).  Now from inside the locker attach the frame, back panel, 
and walls to the top using (24) pan head screws; (6) for each wall, (6) for the frame and (6) for 
the back panel. 

 

Содержание Bike locker DL1

Страница 1: ......

Страница 2: ...and door 2 Front Frame Now stand up the frame louvers at the top 3 Exterior Wall Next locate an exterior wall these are painted powder coated walls Attach the wall to the frame using 5 pan head screws...

Страница 3: ...re stability rigidity and secure the wall to the frame using 5 pan head screws Next secure the wall to the back panel using 5 pan head screws insuring both splice plates are aligned and sandwiched bet...

Страница 4: ...n be installed The upper lock bar must be inserted into the guide at the top of the door before the CAM can be installed 9 Lock CAM The CAM slides onto the padlock handle shaft after a nylon washer 75...

Страница 5: ...n washer 5 OD x 266 ID x 06 THK this get sandwiched between the CAM and lock bar and 1 nylock nut 11 Lower Lock Bar Now install the lower lock bar by sliding it through the guide on the bottom of the...

Страница 6: ...with the back panel The rest of the locker can be assembled by repeating steps 5 13 Finish the remaining lockers until you reach the end of the bank configuration using a painted wall at the end 13 F...

Страница 7: ...tion can be anchored to the concrete using the provided 4 redheads a Anchors are placed in four corners of the bank b Line up a Hammer Drill with a 3 8 bit suitable for concrete and drill a hole throu...

Страница 8: ...ed Using a hammer pound the redhead into the ground make sure you already have the nut on your redhead before you begin hammering as they tend to mushroom where struck Be careful not to strike the loc...

Отзывы: