background image

DTSL3/FR MKII USER’S MANUAL

16

Chapter

Chapter

Chapter

Chapter 5

5

5

5 ADJUSTMENT

ADJUSTMENT

ADJUSTMENT

ADJUSTMENT

Level

Level

Level

Level adjustment

adjustment

adjustment

adjustment

:

-By using a level bar and the horizontal pipe and adjusting the adjustment screws at tow sides of the base plate.

-If platform unevenness is resulted from basic unevenness, use iron block to fill up the low place.

-After level adjustment, insert the central expanded nail of ground bolts and use heavy hammer to hammer it.

-Screw down the ground bolts cap.

When the expiry date on the maintenance of concrete hasn’t arrived, one can not install the central expanded nail of ground bolts.

The gap between the base plate and ground after adjustment must be filled with iron plate or concrete.

No

No

No

No load

load

load

load of

of

of

of main

main

main

main machine

machine

machine

machine test:

test:

test:

test:

-Turn on the power QS of "MAIN SWITCH".

-Press “UP” button, pay attention to the synchronization and placidity of the lifting.

-Check and ensure there are no leakage on the oil line .

When testing the lift, no person or other things are allowed to stand or be put near the two sides and beneath the machine. If any

abnormal is found, press button “

EMERGENCY

EMERGENCY

EMERGENCY

EMERGENCY STOP

STOP

STOP

STOP

” to stop it immediately. After clearing obstacles, do the test again.

Load

Load

Load

Load of

of

of

of machine

machine

machine

machine test:

test:

test:

test:

-Drive the vehicle whose weight doesn’t exceed maximum lift weight to the platform, and then the driver leave it.

-Put the lift rubber cushion on the platform.

-Press ‘UP’ button, lift the platform and pay attention to the synchronization and placidity of the lifting.

-Check and ensure no oil leakage.

When beginning load of machine test, no person or other things are allowed to stand or be put near the two sides and beneath the

machine.

Test vehicle whose weight doesn’t exceed maximum lift weight.

Check and ensure there's no leakage on oil line. If any abnormal is found, press button "

EMERGENCY

EMERGENCY

EMERGENCY

EMERGENCY STOP

STOP

STOP

STOP

" to stop it

immediately. After clearing obstacles, do the test again.

Picture 23

All manuals and user guides at all-guides.com

all-guides.com

Содержание DTSL3 MKII

Страница 1: ...in this manual are not binding due to the process of continuous improvement and development we reserve the right to change any specification without prior notification Model No DTSL3 MKII Scissor Lift Low Rise Instruction Manual Maintenance Manual Spare Parts Rev 04 10 03 2015 All manuals and user guides at all guides com a l l g u i d e s c o m ...

Страница 2: ...165Bridge Street Northampton NN11QG UK Tel Tel Tel Tel 44 44 44 44 0 1604 0 1604 0 1604 0 1604 828 828 828 828 557 557 557 557 F F F Fax ax ax ax 44 44 44 44 0 1604 0 1604 0 1604 0 1604 609667 609667 609667 609667 Http www dunlopge co uk Http www dunlopge co uk Http www dunlopge co uk Http www dunlopge co uk AUTHORI AUTHORI AUTHORI AUTHORIS S S SED ED ED ED SERVICE SERVICE SERVICE SERVICE CENTRE C...

Страница 3: ... Contents Manufacturer and service Packing transport and storage Introduction Description of the machine Technical specifications Safety Installation Adjustment Operation Maintenance and care Troubleshooting Accessory All manuals and user guides at all guides com ...

Страница 4: ...scillations During loading and unloading operation goods must be handled by vehicles or ships At the arrival of the goods verify that all items specified in the delivery notes are included If finding missing parts possible defects or damage due to transport one should examine damaged cartons according to Packing List to verify the condition of damaged goods and missing parts also the person in cha...

Страница 5: ... assembly installation starting up initial adjustment and testing extraordinary maintenance repair overhauls transport and dismantling of the lift must be performed by specialized personnel from the licensed dealer authorised by the manufacturer The manufacturer declines all responsibility for injury to persons or damage to vehicles or objects when any of the above mentioned operations has been pe...

Страница 6: ...equipment for hydraulic failure and over loading So when the oil pipe bursts the machine will not fall quickly Own manual lowering operation when the power is cut and the manual pump is prepared by the user Equipment Equipment Equipment Equipment Machine basement The position and space of equipment installation Machine frame The main structure of lift and insurance institution Control box Machine ...

Страница 7: ...height 105mm Platform length 1450mm Platform width 530mm Lifting time 50s Descent time 60s Whole machine length 2010mm Whole machine width 1860 mm Weight 600kg Voltage AC 400V or 230V 5 50Hzor 60HZ special ordered Please check the nameplate on control box for detail Motor power 2 2kw Hydraulic oil 12L corresponds to wearable hydraulic oil prepared by user Working temperature 5 40 Working humidity ...

Страница 8: ...cture Picture 3 3 3 3 Motor Motor Motor Motor Pump Pump Pump Pump Type Y90L Power 2 2kw Voltage AC 400 or 230V 5 Current 400V 8A 230V 15A Frequency 50Hz or 60 HZ special ordered Poles 4 Speed 1450 rpm min Building shape B14 Insulation class F Type gear pump Model P4 3 Flux 4 3cc r Joint type direct joint Overfull valve Setting pressure 220 bar Adjustable working pressure 150 300 bar Picture 3 All ...

Страница 9: ...E LOWER PARTS OF THE VEHICLES UNDERBODY COULD INTERFERE WITH STRUCTURAL PARTS OF THE LIFT TAKE PARTICULAR PARTS OF THE SPORTS CAR The lift will also handle customized or non standard vehicles provided they are within the maximum specified carrying capacity Also the personnel safety zone must be defined in relation to vehicle with unusual dimensions Supply Supply Supply Supply at at at at the the t...

Страница 10: ...forms for personnel or lifting personnel Use as a press for crushing purposes Use as elevator Use as a lift jack for lifting vehicle bodies or changing wheels The manufacturer is not liable for any injury to persons or damage to vehicles and other property caused by the incorrect and unauthorised use of the lifts During lifting and descent the operator must remain in the control station as the dia...

Страница 11: ...perators or maintenance fitters may be exposed to when the vehicle is standing on the platforms in the raised position together with the various safety and protection devices adopted by the manufacturer to reduce all such hazards to the minimum For optimal personal safety and safety of vehicles observe the following regulations Do not enter the danger areas when vehicles are being lifted Picture 5...

Страница 12: ...capacity of the lift When the platform is being tested the vehicle engine can not be turned on There is nothing should be placed on the lift lowering area and the movable parts of the lift RISK OF SLIPPING Picture 12 The floor caused by lubricant contamination of around the lift The area beneath and immediately surrounding the lift and also the platforms must be kept clean Remove any oil spills im...

Страница 13: ...250 kg cm the thickness of concrete 150 mm All parts of the machine must be uniformly lit with sufficient light to make sure that the adjustment and maintenance operations can be performed safely and without reflected light glare that could give rise to eye fatigue The integrality of arrived goods should be checked before the lift is installed Moving and installing lift should follow the process a...

Страница 14: ...up up limit limit limit limit switch switch switch switch up limit switch is labeled 102 and 100 to connect them to the same no in the control box C C C Connection onnection onnection onnection of of of of lower lower lower lower limit limit limit limit switch switch switch switch lower limit switch is labeled 105 107 and 109 to connect them to the same no inside the control box Oil Oil Oil Oil PI...

Страница 15: ... ed ed ed person person person person can can can can operate operate operate operate it it it it Oil Oil Oil Oil make up make up make up make up adjustment adjustment adjustment adjustment 1 Press UP UP UP UP button and then motor starts to lift two platforms to go up to the apex 2 Open the control box of door and press UP UP UP UP button and SB4 as picture 21 for some minutes 3 Press DOWN DOWN D...

Страница 16: ...k and ensure there are no leakage on the oil line When testing the lift no person or other things are allowed to stand or be put near the two sides and beneath the machine If any abnormal is found press button EMERGENCY EMERGENCY EMERGENCY EMERGENCY STOP STOP STOP STOP to stop it immediately After clearing obstacles do the test again Load Load Load Load of of of of machine machine machine machine ...

Страница 17: ...OWN button the platforms descend And the platforms will stop lowering automatically around 200 300mm height when reach the lower limit switch Release DOWN DOWN DOWN DOWN button then press SECOND SECOND SECOND SECOND DOWN DOWN DOWN DOWN button to let platforms go down to the lowest position EMERGENCY EMERGENCY EMERGENCY EMERGENCY STOP STOP STOP STOP When the machine has abnormal during car maintena...

Страница 18: ...rrect Check and correct wire connection The AC contactor in the circuit of the motor does not pick up If the motor operates when forcing the contactor down with an isolation rod check the control circuit If the voltage at two ends of the contactor coil is normal replace the contactor The limit switch is not closed Check the limit switch wires and adjust or replace the limit switch In lifting opera...

Страница 19: ...ACCESSORY ACCESSORY ACCESSORY ACCESSORY Hydraulic Hydraulic Hydraulic Hydraulic pressure pressure pressure pressure schematic schematic schematic schematic diagram diagram diagram diagram All manuals and user guides at all guides com ...

Страница 20: ... USER S MANUAL 20 ACCESSORY ACCESSORY ACCESSORY ACCESSORY Oil Oil Oil Oil pipe pipe pipe pipe connection connection connection connection diagram diagram diagram diagram All manuals and user guides at all guides com ...

Страница 21: ...on extension extension extension ramp ramp ramp ramp EXPLODED EXPLODED EXPLODED EXPLODED DRAWING DRAWING DRAWING DRAWING A PLATFORM A PLATFORM A PLATFORM A PLATFORM DTSL3 MKII All manuals and user guides at all guides com a l l g u i d e s c o m ...

Страница 22: ...B CYLINDER B CYLINDER B CYLINDER B CYLINDER See See See See above above above above picture picture picture picture All manuals and user guides at all guides com ...

Страница 23: ...C CONTROL C CONTROL C CONTROL C CONTROL BOX BOX BOX BOX All manuals and user guides at all guides com ...

Страница 24: ...D PUMP D PUMP D PUMP D PUMP All manuals and user guides at all guides com ...

Страница 25: ... 2 13 15 Bush ZC AT 3030 4 3 16 Bush ZC AT 3040 4 3 18 Snap ring PD CR 32 4 1 19 Axle SLB1300 2 6 20 Alignment knot SSE0200 2 4 21 Outer scissor SSB0100L 30SLV 1 145 21a Outer scissor SSB0100R 30SLV 1 145 22 Inner scissor SSB0200L 30SLV 1 155 22a Inner scissor SSB0200R 30SLV 1 155 23 Snap ring PD CR 20 4 1 24 Axle SSB0600 4 4 25 Bush ZC AT 2020 4 3 28 Snap ring PD CR 16 16 1 29 Axle SSC0400 4 3 30...

Страница 26: ...USD USD USD 1 Control cover with panel but no buttons WS CC 285 445 1 20 2 Buzzer WS B 01 1 4 3 Power lamp WS LW 01 1 4 4 UP button WS BT 06 1 3 5 Main switch WS SW 02 1 16 6 Emergency stop button WS SW 03 1 5 7 LOCK DOWN button WS BT 06 1 3 8 DOWN button WS BT 06 1 3 9 Circuit board with wiring and electrical parts CNJ0400 1 85 10 Fuse WS F 8 3 1 Fuse WS F 2 1 1 Fuse box WS FB 01 4 1 11 AC contac...

Страница 27: ...Stopple of pump PC 02 1 2 2 Connecting axle 32017 1 7 3 Socket cap screw LD SCS M640 4 3 4 Stopple of oil tank LS HHB M2010 1 3 5 Throttling valve PV 06 1 25 6 Overflowing valve PV 03 1 35 7 Valve block VB 100 80 72 1 60 8 Oil hose 32023A 1 8 9 Oil hose 32023B 1 6 10 Filter 32024 1 20 11 Gear pump 32012 B 1 240 Socket cap screw LD SCS M850 LD SCS M870 2 12 Oil hose 32020A 1 10 13 O ring MF R 115 3...

Отзывы: