
4
Installation shall conform to requirements of author-
ity having jurisdiction or in absence of such require-
ments:
• United States
• National Fuel Gas Code, ANSI Z223.1/NFPA 54.
• National Electrical Code, NFPA 70.
• Canada
• Natural Gas and Propane Installation Code, CAN/CSA
B149.1.
• Canadian Electrical Code, Part I, Safety Standard for
Electrical Installations, CSA C22.1
Where required by authority having jurisdiction,
installation shall conform to Standard for Controls
and Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1.
Additional manual reset low water cutoff and/or manual
reset high limit may be required.
Requirements for Commonwealth of
Massachusetts:
Boiler installation must conform to Commonwealth of
Massachusetts code 248 CMR which includes but is not
limited to:
• Installation by licensed plumber or gas
fi
tter.
Installers
- Follow local regulations with respect to instal-
lation of CO (Carbon Monoxide) Detectors. Follow main-
tenance recommendations “Maintenance And Cleaning” on
page 45 .
NOTICE
Used to address practices not related to personal
injury.
CAUTION
Indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
!
!
WARNING
Indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
!
DANGER
Indicates a hazardous situation which, if not avoided,
WILL result in death or serious injury
!
This is the safety alert symbol. Symbol alerts you to
This is the safety alert symbol. Symbol alerts you to
potential personal injury hazards. Obey all safety messages
potential personal injury hazards. Obey all safety messages
following this symbol to avoid possible injury or death.
following this symbol to avoid possible injury or death.
Become familiar with symbols identifying
Become familiar with symbols identifying
potential hazards.
potential hazards.
General
Boiler installation shall be completed by quali
fi
ed agency.
See glossary for additional information.
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death
or serious injury. Read this manual and understand
all requirements before beginning installation.
!
IMPORTANT SAFETY INFORMATION
Keep this manual near boiler
Retain for future reference
Содержание Q90-100
Страница 2: ...2 DIMENSIONS 2 Figure 1 Boiler Dimensions...
Страница 12: ...12 NEAR BOILER PIPING Figure 2 Single Zone Boiler Piping...
Страница 14: ...14 Figure 4 Two Zone Boiler Piping With Circulators NEAR BOILER PIPING...
Страница 15: ...15 NEAR BOILER PIPING Figure 5 Primary Secondary Piping And Wiring With Circulators And Domestic Hot Water...
Страница 19: ...19 Figure 9 Diaphragm Type Expansion Tank Piping NEAR BOILER PIPING...
Страница 20: ...20 Figure 10 Conventional Closed Type Expansion Tank Piping NEAR BOILER PIPING...
Страница 24: ...24 Figure 12 Roof Vent Intake Terminations COMBUSTION AIR AND VENT PIPE VENT AIR INTAKE...
Страница 32: ...32 Figure 21 Ladder Wiring Diagram ELECTRICAL WIRING...
Страница 34: ...34 Figure 23 Ladder Diagram for Figure 22 ELECTRICAL WIRING...
Страница 40: ...40 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Table 9 State Code Definitions...
Страница 41: ...41 S9381A INTEGRATED BOILER CONTROL OPERATION AND ADJUSTMENTS Figure 26 Sequence of Operation...
Страница 48: ...48 TROUBLESHOOTING Table 10 Error Codes...
Страница 55: ...NOTES...
Страница 56: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...