Oil Boiler Cleaning:

1. 

Shut off all electrical power to boiler / burner and shut 

off fuel oil supply.

2. 

Remove vent pipe from top of boiler. Inspect pipe and 

chimney for signs of corrosion and deterioration. Clean 

out base of chimney. If vent pipe shows any signs of 

corrosion or deterioration, replace it immediately. If 

chimney damage or deterioration is discovered, contact 

a service technician.

3. 

Remove top jacket panel screws (5), brass wing nuts 

(2) holding flue collector top, and flue collector top. 

Inspect gasket on underside of flue collector and 

replace as necessary. 

4. 

Before beginning to clean flue passageways, insure 

combustion chamber blanket is covered. If blanket is 

not covered prior to cleaning, replace blanket once 

cleaning is completed.

5. 

With access to flue passageways, remove soot from 

fireside surfaces by brushing diagonally through flue 

passages (see drawing below). Brushing can be made 

easier by cutting end of flue brush off and inserting 

it into drill. When brushing, take care to not damage 

target wall with flue brush.

6. 

Carefully vacuum soot accumulations from 

combustion chamber area, take care to not damage 

any of refractory or blanket insulation. To gain 

access to combustion chamber first check that shut 

off valve on fuel oil line is closed and disconnect 

fuel oil line. Open swing door by removing whiz lock 

nut holding door shut.

7. 

Inspect target wall, fire door refractory, and 

combustion chamber blanket (when included) for 

cracking and deterioration. If there are signs of 

cracking or deterioration, replace refractory or 

blanket before reassembling burner / front plate.

8. 

Inspect door’s braided gasket for wear and damage. 

Replace when necessary with braided gasket of 

same material and size. 

9. 

Inspect and clean oil burner.

OIL BOILER / BURNER CLEANING INSTRUCTIONS 

NOTICE

Important operating and maintenance 

requirements:

•  Keep your boiler and the area around it clean 
•  Never burn refuse or any material other than 

specified fuel in your boiler

Figure 19 - 

Brush Diagonally Through Flue 

Passages

 

PN 240013012, Rev. B [12/15/2020]

Содержание EMPIRE 3EWC0.80

Страница 1: ...ON MAINTENANCE MANUAL Maximum Allowable Working Pressure 50 psi Models 3EWC0 80 T 4EWC1 00 T 4EWC1 25 T 5EWC1 55 T Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 Tel 800 325 54...

Страница 2: ...at this heat stays in the structure Net AHRI Rating represents portion of remaining heat that can be applied to heat radiation or terminal units finned tube baseboard cast iron radiators radiant floor...

Страница 3: ...British Thermal Unit Heating Capacity based on 13 1 CO2 with a 0 02 w c draft over fire and a 1 smoke or less Testing was done in accordance with the D O E Department of Energy test procedure gph Gal...

Страница 4: ...nent injury Children elderly and infirm or physically handicapped persons are more likely to be permanently injured by hot water Never leave them unattended in bathtub or shower Never allow small chil...

Страница 5: ...e hindered by overfilling the boiler Recommend initial fill pressure of 10 12 psig For higher fill pressures expansion tank s air charge will need to be increased to match fill pressure Consult manufa...

Страница 6: ...uire attention Install boilers at least 6 from combustible material on left side rear and above and at least 24 on right side and front Allow at least 24 accessibility clearance above for servicing 5...

Страница 7: ...IN RETURN LINE OR AFTER THE EXPANSION TANK SHUT OFF VALVE OIL FILTER OIL LINES FOUNDATIONS TO OUTSIDE LINES TO OTHER APPLIANCES SERVICE LINE OVERCURRENT PROTECTED SAFETY SWITCH 2 FILL PIPE MIN 2 I D...

Страница 8: ...y with additional room s of sufficient volume so the combined volume of all spaces meets the criteria for unconfined space Total input of all combustion equipment installed in combined space shall be...

Страница 9: ...3 When communicating with outdoors through horizontal ducts each opening shall have minimum free area of one square inch per 2 000 Btu per hour of total input rating of all equipment in the enclosure...

Страница 10: ...res 6a and 6b A Install safety relief valve with spindle in vertical position B Do not install shutoff valve between boiler and safety relief valve C Install discharge piping from safety relief valve...

Страница 11: ...ally cause damage to boiler and venting system Minimum design return water temperature to prevent this condensation in boiler and venting is 120 F Boiler used in heating system where design water temp...

Страница 12: ...NOTE CIRCULATOR CAN ALSO BE INSTALLED ON RETURN PIPING PIPING ARRANGED FOR POWER PURGING AIR OUT OF SYSTEM PIPING REFER TO THIS MANUAL S SECTION ON FILLING THE SYSTEM WITH WATER OPTION 1 Figure 8 Syst...

Страница 13: ...XPANSION TANK PIPING ARRANGED FOR POWER PURGING AIR OUT OF SYSTEM PIPING REFER TO THIS MANUAL S SECTION ON FILLING THE SYSTEM WITH WATER OPTION 1 SYSTEM PIPING Figure 9 System Piping Arrangement Zonin...

Страница 14: ...G PUMPS AWAY FROM EXPANSION TANK PER THIS MANUAL USE OPTION 2 IN FILLING THE SYSTEM WITH WATER THIS PIPING ARRANGEMENT CAN BE USED WITH ZONE VALVES OR ZONE CIRCULATORS SYSTEM PIPING Figure 10 System P...

Страница 15: ...uous flow NOTICE Do not use tankless coil if your water is excessively hard with lime or other deposits which will accumulate inside the coil When using tankless coil the Hydrolevel control is mounted...

Страница 16: ...ent installations shall be in accordance with applicable provisions of NFPA 31 Standard for the installation of Oil Burning Equipment latest edition and applicable provisions of local building codes N...

Страница 17: ...e boiler Install chimney connector start at boiler with vertical pipe elbow then install draft regulator horizontally When regulator is in place start at chimney and work back to the regulator Join th...

Страница 18: ...THAN HIGHEST PART OF PASSAGE THROUGH ROOF MUST BE AT LEAST 2 FT HIGHER THAN ANY NEIGHBORING OBJECT WITHIN 10 FT MUS MUST HAVE AN UNOBSTRUCTED TOP OPENING TYPICAL CHIMNEY CONNECTION Figure 12 Typical...

Страница 19: ...lations Connect 120 volt electrical supply to L1 and L2 terminals and two thermostat wires to T and T terminals on Hydrolevel limit control Run separate circuit from separate over current protection d...

Страница 20: ...20 ELECTRICAL WIRING Figure 13 Hydrolevel 3250 Control with Beckett or Carlin Burner PN 240013012 Rev B 12 15 2020...

Страница 21: ...21 Figure 14 Hydrolevel 3250 Control with Riello Burner ELECTRICAL WIRING PN 240013012 Rev B 12 15 2020...

Страница 22: ...e runs air free close isolation valve or zone valve Repeat this procedure for remaining heating zones D Once all zones are filled with water and purged of air close power purging drain valve and fill...

Страница 23: ...rner flame will be dark orange and formation of soot will occur in heating unit In buildings of conventional frame brick or stone construction that do not have utility rooms basement windows or stair...

Страница 24: ...1HP 0 80 2 1 4 0 65 60 W 150 0 60 0 65 50 4EWC1 00 T EZ 1HP 1 00 2 1 4 0 85 60 B 150 0 85 1 00 60 4EWC1 25 T EZ 1HP 1 25 2 1 4 1 00 60 B 155 0 85 1 00 75 5EWC1 55 T EZ 1HP 1 55 2 1 4 1 25 60 B 155 1 1...

Страница 25: ...trode Setting Figure 17 Riello Turbulator Setting Figure 18 Carlin Electrode Setting Turbulator Setting A Loosen NUT 1 turn SCREW 2 until INDEX MARKER 3 is aligned with correct index number per Burner...

Страница 26: ...chamber is very hot Adjust Thermostat Heat Anticipator or Thermostat Cycle Rate According to Instructions Included With The Thermostat Check Thermostat Operation Follow instructions included with you...

Страница 27: ...manually refill system Diaphragm Expansion Tank Tank may become water logged Frequent automatic opening of safety relief valve indicates water logging High boiler temperature accompanied by unusually...

Страница 28: ...nd of flue brush off and inserting it into drill When brushing take care to not damage target wall with flue brush 6 Carefully vacuum soot accumulations from combustion chamber area take care to not d...

Страница 29: ...ure head location and size if applicable are per manufacturer s recommendations If burner being used has damaged head replace head with same head recommended for use on this boiler 6 Inspect and clean...

Страница 30: ...ectric power supply circuit is ON Controls out of adjustment Reset according to instructions Radiators not heating Open radiator vents to excess air Check flow control valve if used It may be in close...

Страница 31: ...31 PUMP CURVES 15 10 5 0 5 4 3 2 1 m Head 1 2 3 4 5 US GPM 5 10 15 20 m h 3 Head feet Grundfos UP15 42F Pump Curve B G NRF22 Pump Curve PN 240013012 Rev B 12 15 2020...

Страница 32: ...decreases This feature is equipped with an override which is provided primarily to permit the use of an external energy management system that serves the same function THIS OVERRIDE MUST NOT BE USED U...

Отзывы: