9
A
E
E
D
A
C
B
F L O O R
F L O O R
F
F
F
F
Boiler Front
View
Boiler Left Side View
FIGURE 4-1a Clearance to Combustible Materials
4 - LOCATING BOILER
FIGURE 4-2a Service Clearances - Boiler Front
FIGURE 4-1b Clearance to Combustible Materials
FIGURE 4-2b Service Clearances - Boiler Left side
Boiler
Front View
FIGURE 4-2c Service Clearances - Closet Installation
17
3/4 "
(
450
mm)
Minimum Service
clearance to front
of boiler
Boiler Left
Side View
17
3/4 "
(
450
mm)
CLOSET INSTALLATION
TOP VIEW
1
3/4 "
(
400
mm)
1
3/4 "
(
400
mm)
1
3/4 "
(
400
mm)
BACK
CLEARANCES REQUIRED FOR CLOSET
INSTALLATION
0 in. /0 mm between the Back of the Unit and the wall
0" (0mm)
A
0" (0mm)
1-3/4"
(45mm)
1-3/4"
(45mm)
(See Table 2, page 8)
(See Table 2, page 8)
0" (0mm)
0" (0mm)
0" (0mm)
0" (0mm)
0" (0mm)
1-3/4"
(45mm)
0" (0mm)
0" (0mm)
P/N 240011656, Rev. E [07/30/2018]