
20 … 72
MC • Edition 05.20 • Nº 279 663
21 … 72
9.2 Installation instructions
•
The installation must be carried out according to the
installation scheme specified below.
•
Installation of the safety shut-off valve in the flow
direction (arrow/housing).
•
Design a straight stabilisation section with the same
diameter.
•
Run pulse line clean and burr-free. Distance > 5 x DN
Pos. Designation
1
Shut-off valve, inlet side (e.g. ball valve or butterfly valve)
2
Filter
3
Welded part
4
Pressure gauge, inlet side
5
Regulator with SAV integrated
6
Stabilisation section
7
Pressure gauge, outlet side
8
Pushbutton cock
9
SBV
10
Venting ball valve
11
Shut-off valve outlet side (e.g. DMV)
12
Breathing connection regulator
13
Breathing connection SAV
14
Relief connection SBV
•
Maximum flow velocity in the stabilisation section:
≤ 30 m/s.
•
(Version of the pulse lines: steel pipe D= 12 x 1.5, only
with external pulse)
•
(Avoid accumulation of condensate: install the pulse
lines with a gradient, only with external pulse.)
1
2
3
4
5
8
6
7
9
11
10
12
Stabilisation section
> 5 x DN
Installation scheme
13
14
Содержание 279042
Страница 14: ...14 72 MC Edition 05 20 Nº 279 663 A B C D E A B C D E F Type UHD F Type HD ...
Страница 15: ...MC Edition 05 20 Nº 279 663 15 72 A B C D F E A B C D E F ND MD for G2 DN40 DN50 ND for G1 G1 5 y DN25 ...
Страница 43: ...MC Edition 05 20 Nº 279 663 43 72 Type UHD X Y Q S W V M C A B D E G F J K L N P H O R U I ...
Страница 45: ...MC Edition 05 20 Nº 279 663 45 72 Type ND MD for 2 DN40 DN50 M B D E G F J K L N H X Y Q S W V O I T ...
Страница 64: ...64 72 MC Edition 05 20 Nº 279 663 14 4 Tools required A B C2 D C1 ...