
20 … 72
MC • Edition 05.20 • Nº 279 663
9. Assembly/installation
9.1 General information
•
This device should only be installed in
compliance with the applicable rules
and standards and in accordance with
the local regulations, if necessary ap-
ply for the required approvals.
•
Install the device in a building or
under a cover; do not install it out-
doors without appropriate protective
measures!
• The work area must be provided with general
safety devices.
• The lifting devices used must be suitable for the
load to be lifted.
• Enough installation space for operation and main-
tenance has to be provided.
• We recommend installing a filter with a pore size
≤ 50 µm upstream of the regulator.
• The installation must not impair the functioning
of other components.
Check prior to installation!
•
The shut-off valves both on the inlet and outlet side are
closed.
•
Lines are free from combustible gas.
•
Prevent explosive gas-air mixture: the room atmosphere
must constantly be monitored using appropriate gas
concentration measuring devices for the detection of
gas leakages.
•
Ensure electrically conductive bridging.
Prevent contact voltage and ignitable flash-over.
•
The performance data on the type plate correspond to
the ordering data.
•
Flanges on the inlet side and outlet side of the con
-
necting line are parallel.
•
The sealing surfaces of the flange are undamaged and
clean.
•
The maximum inlet pressure of the system is lower
than the maximum admissible pressure of the regula
-
tor.
•
Protective caps at the connecting flange must be
removed.
•
The minimum distances for the setting must be
observed.
•
The pipeline on the inlet side must be free of water and
dirt.
Make sure during installation!
•
Tension-free assembly.
•
Tighten the screws crosswise.
•
Tightening torques must be observed.
•
Vent lines and blow-off lines individually piped.
•
Vent lines and blow-off lines must end in free space:
gases must be exhausted to a safe place.
•
The pulse lines may not be shut off.
•
The specified distance between the measuring points
of the pulse lines must be observed.
•
The flow direction (arrow) on the housing must be
followed.
Содержание 279042
Страница 14: ...14 72 MC Edition 05 20 Nº 279 663 A B C D E A B C D E F Type UHD F Type HD ...
Страница 15: ...MC Edition 05 20 Nº 279 663 15 72 A B C D F E A B C D E F ND MD for G2 DN40 DN50 ND for G1 G1 5 y DN25 ...
Страница 43: ...MC Edition 05 20 Nº 279 663 43 72 Type UHD X Y Q S W V M C A B D E G F J K L N P H O R U I ...
Страница 45: ...MC Edition 05 20 Nº 279 663 45 72 Type ND MD for 2 DN40 DN50 M B D E G F J K L N H X Y Q S W V O I T ...
Страница 64: ...64 72 MC Edition 05 20 Nº 279 663 14 4 Tools required A B C2 D C1 ...