17
Pt. No. 67442
Issue 0119
‘Renovator AS4000’
Calibration
Seed Calibration
The calibration test should be done to confirm the settings of
the required seed rate and is done with the drill stationary and
level with the fan off.
The metering units must be set prior to filling with seed.
Seed Calibration Procedures
1
Ensure that the metering unit is free from debris. Close
the trap-door.
2
Fill the appropriate bin. A minimum depth of 300mm is
required for calibration with normal seeds.
3
Release the elbows from under the metering housings
by unscrewing the wing nut and swinging the keeper out
of the way. Move the elbow to one side.
4
Unhook the calibration tray from the rear of the machine,
locate it on the guides and slide the tray under the bin
outlets.
5
The bins are calibrated one-at-a-time; on the drive
pedestal (outboard) end, remove the lynch pin and
disconnect the unused driveshaft. Attach the end to the
dummy shaft provided on the pedestal.
6
Place the crank handle over the hexagonal drive dog
turn anti-clockwise until the seed flows consistently.To
ensure complete filling of the seed unit continue turning
the crank until an even flow of seed is coming out of the
seeder units, then empty into the seedbox. The drill is
now ready for calibration.
8 Refer to the table on the next page and turn the crank
handle anticlockwise the number of turns for your
machine.
Note
The Calibration is usually done for 1/40th Hectare.
For very small seed rates or when using inaccurate
scales (i.e. unable to measure to the nearest gram) the
calculation based on 1/10th hectare should be used.
ie: In the case of a 26R 4.0m machine, turn the crank
handle 95 turns.
Scales must be accurate to 2 grams as any error will
be multiplied by either 10 or 40 giving inaccurate
calibration results.
For 1/40 Hectare (250m
2
) Calibration
Seed Rate = Actual Seed Collected (kg) x 40
For 1/10 Hectare (1000m
2
) Calibration
Seed Rate = Actual Seed Collected (kg) x 10
Содержание Renovator AS4000
Страница 2: ......
Страница 6: ...4 ...
Страница 28: ...26 ...
Страница 29: ...27 Pt No 67442 Issue 0119 Renovator AS4000 Calibration Notes ...
Страница 38: ...36 Renovator AS4000 Maintenance Notes ...
Страница 39: ...37 Pt No 67442 Issue 0119 ...
Страница 40: ...38 ...
Страница 42: ...40 Renovator AS4000 Complete Assembly 7 8 6 4 5 9 3 12 1 2 10 11 ...
Страница 48: ...46 Renovator AS4000 Wheel Leg 8 9 10 11 2 5 1 6 7 3 4 2 3 4 3 8 9 11 17 18 12 13 14 15 16 ...
Страница 52: ...50 Left Hand Tine Shown 11 12 10 1 4 2 7 8 13 3 9 5 14 9 Renovator AS4000 Tine Boot Assembly ...
Страница 56: ...54 Renovator AS4000 Chains Tensioners 1 1 2 3 For Jockey Chain Tensioner see items 23 to 28 on previous page ...
Страница 60: ...58 1 2 5 2 7 9 10 11 12 12 8 11 7 7 6 8 7 7 8 7 9 5 6 7 8 7 8 7 6 7 6 10 7 3 4 Renovator AS4000 Seedbox Frame ...
Страница 64: ...62 2 3 6 15 5 4 6 10 9 13 7 1 8 12 11 14 Renovator AS4000 Seed Fert Box ...
Страница 66: ...64 Renovator AS4000 Metering Unit 3 1 2 9 2 9 5 8 7 5 6 4 ...
Страница 70: ...68 ...