12
Transport
1
Raise the drill into the transport position and hold at the full
extent of the rams for a few seconds to allow cylinders to
rephase/equalise.
2
Important
- To avoid machine damage due to drill
lowering during transport, always close the hydraulic
valves for the wheels and drawbar. Move the handles to a
position at 90
0
to the hydraulic line as shown in Fig 3/1.
3
Locate jack stand in transport position. Refer Fig 4.
4
Ensure lighting and oversize warning requirements meet
recommendations published by the local Land Transport
Authority or equivalent.
5
Maximum towing speed for the drill is
40 km/hr
.
For countries other than New Zealand, greater speed
restrictions may apply. Please refer to your local
transport authority.
Ensure towing vehicle requirements are adequate for the
towed vehicle e.g. mass, brakes. Refer to
recommendations published by the local Land Transport
Authority or equivalent.
Braking when towing can cause the load to jackknife. Use
extra care when towing in adverse conditions such as mud,
inclines and sharp bends.
Lower towing speeds are recommmended on farm
roads/tracks and where one wheel is on or over a road
verge.
6
Attach safety chains to tractor.
Refer Fig 5.
Safety chains must be crossed over underneath the
coupling and attached to the towing vehicle. The
attachment points must be as close as practical to the
towing coupling and one each side.The towbar on the
towing vehicle must be rated for the towed mass.
Do not
remove or replace the safety chains provided with any
other than those specified in the parts manual.
Note:
The safety chains are provided with sufficient length
to cater for all towing vehicles. Safety chains must be
shortened by cutting off excess length so that if the
coupling fails the drawbar will not hit the ground.
7
If the machine is fitted with row markers or other vertical
extensions check clearance under power lines en route.
Fig 3
Fig 4
Fig 5
1
Содержание Enviro 3000e
Страница 2: ......
Страница 24: ...22 Enviro 3000e Seed Drill Calibration Notes ...
Страница 25: ...23 Pt No 67303 Issue 0806 Enviro 3000e Seed Drill Calibration Notes ...
Страница 32: ...30 Enviro 3000e Seed Drill Maintenance Notes ...
Страница 34: ......
Страница 38: ...4 61 60 70 63 64 65 66 67 68 71 62 59 69 ...
Страница 40: ...6 3 9 6 17 28 19 33 34 35 7 36 8 1 10 14 11 25 20 13 24 29 26 27 31 9 31 2 22 23 32 30 4 5 18 12 15 16 21 ...
Страница 46: ...12 5 6 ...
Страница 60: ...26 1 1 2 3 3 4 4 5 6 6 7 7 8 8 9 9 10 10 11 14 ...
Страница 62: ...28 4 3 1 13 15 16 11 17 7 5 8 6 2 9 14 12 12 11 10 10 11 12 Not Shown ...
Страница 64: ...30 2 2 1 8 9 2 5 5 3 4 3 4 6 6 7 3 10 7 ...
Страница 66: ...32 Enviro 3000e Seed Drill Operator Notes ...
Страница 68: ...1 ...
Страница 95: ...28 Figure 33 Motor control module offline A B C D E F G H I ...
Страница 101: ...34 Figure 43 NUDGE screen 3 A B C D E F G H I ...