![DUGENA Premium 70 000 82 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/dugena-premium/70-000-82/70-000-82_instruction-manual_2538482027.webp)
27
Summary: Correct sequence of manual winding
1. Wind the watch (20 – 25 x) – crown position (1)
2. Set the time: move hands in crown position (2) –
optionally until changing of date. Now set the
correct time.
3. Correct the date – crown position (2).
4. Push back the crown in position (1).
Your watch is now ready for operation.
Содержание 70 000 82
Страница 1: ...1 70 000 82 Automatic Mechanic...
Страница 2: ...2...
Страница 13: ...13...
Страница 33: ...33...
Страница 38: ...38...
Страница 39: ...39 DUGENA Fachgesch ft DUGENA Shop Garantie Marke Warranty Stamp Ref Nr Ref No Verkaufsdatum Date of Purchase...