14
Page 15/20
D040373A
15 16
Tilt the stabilizer
.
Set the floor horizontally to the
work height and
set the locks of the floor's
lift-off protection.
17
Lower the brace horizontally and tighten the
collar.
13
Move the stabilizer vertically closer to the ladder's
upright.
Hang the upper end to the
rung, as
advised by this user guide on page 3, 5 or 7.
Set the floor's extremities one after the other
to
reach the proper work height.
The hooks' sliding ramps allow for a
tilted
orientation of the floor
.
18
Spread the stabilizer's runner down to the ground
with the manual command.
Follow the assembly steps for each part and continue assembling the scaffolding to the desired
height.