Then seal as tight as possible and cover with a trim collar.

   6.  The furnace must have its own flue. Do not connect this unit to a chimney flue serving another appliance.

   7.  The masonry chimney should not have any missing mortar or loose bricks.

   8.  There should be no mortar or parts of the chimney blocking the chimney flue.

   9.  There should be a two inch clearance between any chimney except chimtek has zero clearance.

 10.  The chimney should extend at least 2’ above the highest point of the house, or 2’ above the point at which

the chimney is 10’ from the roof.

Chimney Requirements

The minimum height of a chimney system for the D.S.

Furnace is 20 feet. The chimney must exceed the roof

of a house at a minimum of 3 feet at any point of exit.

In a pitched roof installation the chimney must be 2

feet higher than anything within a 10 foot radius of the

chimney. It is important to have a chimney draft of 0.06

water column. It is required to abide by the manufac-

turer’s instructions on Class A chimneys as well as

local building codes. It is not recommended to build a

chimney on an addition that is lower than the main part

of your house. Do Not extend the single wall chimney

connector past the inside of a masonry chimney liner.

Never connect this unit to a chimney serving another

appliance. Should you have a problem with inade-

quate draft you should see page 11.

5

Содержание Greenhouse Blast GH450

Страница 1: ...ce you must Read all instructions carefully Install smoke and carbon monoxide detectors MADE IN USA By D S MACHINE SHOP Do Not Discard This Manual DS Greenhouse Blast High Efficiency Wood or Coal Green House Furnace Model GH450 OWNER S MANUAL ...

Страница 2: ... Operational Work Practice Standards 1 When burning wood burn only seasoned dry cord wood that has been dried then warmed before firing Warming cord wood means placing in a heated building for 1 day before burning 2 Keep wood under cover in a wood shed or a tarp 3 Right after delivery stack cord wood under cover 4 Split cord wood before drying 5 Do not burn green wood it needs to have no more than...

Страница 3: ...smell an odor This is normal during the first operation You may want to assemble the furnace out of doors and build a small fire in it to BURN OFF this dirt and oil before installing unit Starting A Wood Fire When starting a wood fire use the same steps as starting a coal fire above but do not add coal Allow ash to build up on top of grates this will not choke fire until it covers louvers For most...

Страница 4: ... back into the furnace The connector pipe should be in stalled so that the upper pipe section fits inside the lower section This way any condensation building up inside the pipe will stay inside the pipe as it flows down the inside surface Horizontal pipe runs should have the pipe seams turned up Particular attention should be paid to the point where the flue passes through a wall or ceiling This ...

Страница 5: ...minimum height of a chimney system for the D S Furnace is 20 feet The chimney must exceed the roof of a house at a minimum of 3 feet at any point of exit In a pitched roof installation the chimney must be 2 feet higher than anything within a 10 foot radius of the chimney It is important to have a chimney draft of 0 06 water column It is required to abide by the manufac turer s instructions on Clas...

Страница 6: ...Thermostat Hook Up for GH Blast 6 ...

Страница 7: ...n on thermostat Then from out of thermostat to cylinder at furnace as per diagram Air regulator needs to be set at 20psi D Test the unit after installed to make sure draft lid opens and closes properly Then build your fire in furnace and set thermostat to desired temperature DS Pneumatic Powered Thermostat Kit I I I I I I I I I I I I I II Air Regulator set at 20psi Thermostat Mount Cylinder on sid...

Страница 8: ...ING Top vent door must be OPEN when O F D is closed to allow air circulation around front of furnace O F D Flange O F D Flange OPEN CLOSE INSTALLATION INSTRUCTIONS Install O F D on GH 450 Furnace See drawing above Install the GH 450 Furnace with the O F D already installed into the wall of your greenhouse With the GH 450 Furnace and Optional O F D in final position frame wall of greenhouse to with...

Страница 9: ...ck 10 2 1 2 x 4 1 2 x 9 Back 2 2 1 2 x 2 1 4 x 9 Right Side 22 2 1 2 x 4 1 2 x 9 Right Side 2 2 1 2 x 1 3 4 x 9 Left Side 22 2 1 2 x 4 1 2 x 9 Left Side 2 2 1 2 x 1 3 4 x 9 TOTAL 58 2 1 2 x 4 1 2 x 9 3 2 1 2 x 2 1 4 x 9 4 2 1 2 x 1 3 4 x 9 ALL Fire Brick are 2 1 2 x 4 1 2 x 9 unless noted otherwise 2 1 2 x 2 1 4 x 9 2 1 2 x 1 3 4 x 9 2 1 2 x 2 1 4 x 9 2 1 2 x 1 3 4 x 9 9 Cast Iron Louvers Cast Iro...

Страница 10: ...8 Fire Door 450 18 FD 2 Cast Iron Ash Door 450 ASH6 D 2 Spinners on Fire Door 450 4 SPOB 2 1 2 Spring Handle on Ash Doors 450 12 CSH 1 5 8 Spring Handle on Fire Door 450 58 CSH 1 Ash Pan 15 1 2 w x 26 d x 6 h 450 155 26 6AP 1 Ash Pan 15 1 2 w x 28 d x 6 h 450 155 28 6AP 1 Back Ash Shaker Bar Assembly 450 160 BASBA 1 Front Ash Shaker Bar Assembly 450 160 FASBA 4 Cast Iron Louvers 450 CI FL 1 Top Do...

Страница 11: ...ace the recommended BTU size for your building If you have a Hot Air Regulator set at high and furnace does not heat properly shorten chain one or more notches Do not exceed 600 degrees on top of furnace Overheating will damage furnace Use seasoned wood ONLY Wet wood robs the energy that normally distributes through the building Recommended 20 or less moisture 3 Problem Excess smoke or flames comi...

Страница 12: ...ion of the furnace The owner is responsible for labor and costs to complete the repair The owner may at his op tion and with D S Stoves approval have the furnace shipped to the factory for repair All labor and material costs for repair at the factory will be borne by D S Stoves The owner is responsible for all shipping costs D S Stoves gaskets paint or enameled parts firebrick and furnace cement a...