![DRUCK & TEMPERATUR Leitenberger LR-Cal DFP Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/druck-and-temperatur-leitenberger/lr-cal-dfp/lr-cal-dfp_operating-manual_2533104023.webp)
DRUCK & TEMPERATUR Leitenberger GmbH •
Bahnhofstr. 33 • D-72138 Kirchentellinsfurt • GERMANY
Tel. +49 (0) 7121-90920-0 • Fax +49 (0) 7121-90920-99 • [email protected] •
• www.druck-temperatur.de
www.LR-Cal.net
MANUAL
TLDMM + TLDMM-A01
TLDMM-A02 + DFP
23
Instrucons for ba ery replacement:
• Unscrew the two hexagon socket screws on the back side of the housing.
• Take care for the two gaskets at the screws. When closing the housing, they must be at the right
place.
• Carefully li the part of the housing. Front part and back part of the housing are connected with
a ribbon cable. Don‘t scratch or damage this cable.
There are different versions: 4 alcaline ba eries 1.5 V size AAA
2 alcaline ba eries 1.5 V size AAA
(previous: 4 alcaline ba eries 1.5 V size AA)
• Carefully displace the (old) ba eries.
• Clean up the clips contacts from possible oxidaon and check the pressure exerted by external
flaps on each ba ery: please increase it if necessary. Verify the electrical contact also in
presence of malfuncons.
• Insert new ba eries. Replace always ALL ba eries together, never just single ones.
Alkaline ba eries shall be either recycled or disposed properly.
Follow the law of your country.
8. Dimensions
Standard instrument
Version for
panel mounng
Rear back connecon
Panel cut-out