HeatMax II Furnace Installation and Operation Manual
31
7.2 Installation and connection of the “RTD” thermal probe
IMPORTANT
: The proper positioning of the “RTD” thermal probe is essential to the proper
functioning of the furnace. Install it in the opening provided for this purpose on the start-off
plenum.
With the plenum extension (A) and the plenum (B)
With 6 self-taping screws
(D)
, install the metal
plate on the plenum
(B)
to block-off the 3 holes.
Make sure the notch
towards the bottom.
Install the RTP probe in
the plenum extension
(A).
Secure the RTD probe
with the two screws
provided
(C)
.
Connect the RTD probe
on the furnace with the
connection.
Содержание DF01001
Страница 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Страница 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Страница 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Страница 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Страница 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Страница 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Страница 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Страница 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...