![Drive DeVilbiss Healthcare Hybrid-Power Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/drive/devilbiss-healthcare-hybrid-power/devilbiss-healthcare-hybrid-power_user-manual_2531731009.webp)
8
–
Hybrid-Power
Installation
Unpackaging
When unpacking the Hybrid-Power System, check for any damage which may have occurred during
transit. If found to be damaged remove the system from use and contact Drive DeVilbiss Healthcare
Ltd.
Setting up
1.
Remove all existing mattress surfaces from the bed frame
2.
Ensure the printed surface is placed facing upwards
3.
Place the mattress on the bed frame with the image of the feet on the cover placed at the foot
end of the bed
4.
Place a loosely fitted sheet over the mattress
5.
Hang the pump at the foot end of the bed; adjust the hangers to secure the pump against the
foot board to reduce vibration. Avoid placing the pump on the floor
6.
Join the connectors on the mattress feed pipes to the side of the pump
NOTE: Ensure the feed pipes on the mattress are not kinked or tucked under the mattress as this
will restrict airflow
7.
Plug the pump into the mains electrical outlet
NOTE: Any extra power cord should be neatly arranged and off the floor to avoid any trips and any
damage to the cable
8.
Turn on the pump using the main switch found on the side of the pump and press the standby
button on the front of the pump
9.
The pumps low pressure indicator will remain until the mattress is inflated to the desired
pressure. The pumps initial set up can take up to 40 minutes
10.
Adjust the pressure setting according to the patients weight
NOTE: If using the mattress without a pump, remove the pump and store in a safe location
The feed pipe can be fastened to the mattress using the retainer clip provided
Содержание DeVilbiss Healthcare Hybrid-Power
Страница 1: ...Hybrid Power User Manual...