Installing Your Drinkpod
Installing Your Drinkpod
Installing Your Drinkpod
18
Installing Your Drinkpod
19
Running Water Source Line
It’s time to run your water line (tubing) from your water source to where your ONYX will be
place. For this section, you will require
1.
Uncoil and run
A
, from where its connected (to your water
source) to wherever you intend to locate your ONYX. Make any necessary adjustments
(i.e. drilling holes) as you go.
2.
Once you have the water line tubing ran all the way to where your ONYX will be
placed, measure out a 1 - 2 ft. of additional tubing. You want to ensure you have sufficient
slack to pull the ONYX away from the wall for maintenance.
3.
Cut the tubing using your scissors or knife. Be careful to cut the tubing straight across (at
a 90 degree angle) to avoid leaks.
Diagram 2.4.3
Cut Tubing
Connecting Your DRINKPOD
Congratulations! You are now close enough to the end that you should be able to taste it.
You should now have a water line running from either
under your kitchen sink
or your
ice
maker hookup
to wherever you plan on locating your new DRINKPOD ONYX. From here
on our, we will refer to this line as your
Source Line
.
1.
Move your new DRINKPOD ONYX to its final location. Do not plug the power cord in
yet.
2.
Remove the plug from the
M
Water Input Port
.
3.
Insert the open end of
A
(the small segment of tubing after
1/4 in. Quick Connect Shutoff Valve
) on your
Source Line
into the
M
Water Input Port
attached at the end of located at the back of your ONYX at the
bottom.
L
M
A
Diagram 2.7.1 -
Connect Source Line To Source Input Port
4.
Continue to firmly insert tubing into opening until it won’t go any further. Then pull tubing
backwards (away) from valve, using medium force, to engage/extend the compression
sleeve on the valve, and ensure the connection is secured.