-
25
-
5
ASSEMBLY GUIDE FOR Z
IP-FASTENER
INSULATION
(only applies to heaters of 750 and 1,000 litre capacity)
Insulation can be mounted by two people only; by three for bigger boilers. It can be performed in areas
where temperature reaches at least 18°C.
If the insulation includes tank bottom insulation, the latter must be mounted first.
The insulation is then
inserted
around the boiler (heater), respecting the pre
-
pressed insulation openings.
By slight tension in the
direction of the arrows both sides of the zip insulation (as indicated in Fig. 20) are drawn together so that
the insulation does not draw down, and the holes in the insulation overlap the inputs and outputs on the
boiler.
It has to be ensured that both halves of the zip closure aren't distant by more than 20 mm from one
another before closing (see Figure 21).
On closing, no foam may penetrate in the zip closure.
Once the insulation shell is properly fitted, and the zip closure closed, the upper foam lid is mounted and a
foil cover or a plastic lid, as the case may be, drawn over.
Alternatively, outlet caps can be glued on the
connecting points (as indicated
in Figure 22).
The insulation must be stored in dry areas only.
We take no responsibility for damages caused by not respecting this guide.
Figure 20
Figure 21
Figure 22
2
-5-
2016