- 8 -
1.2.3
PRESSURE LOSSES
Figure 3
2
OPERATION AND FITTING INSTRUCTIONS
2.1
COMMISSIONING THE RESERVOIR
After connecting the reservoir to the water distribution system, hot water heating system, respectively
electrical power system and after checking the safety valve (following the instructions attached to the valve)
the reservoir can be put into operation.
Procedure:
a)
Check the plumbing and electrical installation, including the connection to hot-water heating system.
Check proper placement of operating and safety thermostat sensors. The sensors must be inserted
all the way in; first the operating and then the safety thermostat.
b)
open the hot water valve on the combination faucet;
c)
Open the cold water inlet valve to the tank
d)
when the water starts flowing through the hot water valve, the filling of the tank is finished
and the valve needs to be closed
e)
Should a leak (of the flange lid) occur, we recommend tightening the screws of the flange lid.
f)
When heating the water with thermal energy from a hot water heating system, turn off the electricity
and open the valves at the inlet and outlet of heating water or bleed the exchanger.
Once the operation restarts, keep flushing the tank until the cloud disappears.
g)
Make sure to fill in properly the warranty certificate.
OKC 400,500 NTRR/HP/SOL
OKC 500 NTRR/HP/SOL
OKC 400 NTRR/HP/SOL