background image

DV-8000 USER’S MANUAL

7

Maintenance

1. To ensure the steady operation of the instrument, it is recommended to use an AC

voltage stabilized power source.

2. After operation , turn off the power and cut off the power supply.
3. Put some desiccants over the instrument when it is not in use to keep it clean and

dry.

4. After months of operation or after it is moved, the instrument should be checked for

its wavelength accuracy.

Calibration And Trouble-shooting

After a long time of use, the instrument needs calibrating or repairing, as its

performance index may have changed, here are some tips.

1. Replacement of tungsten-halogen lamp

1) Turn off and unplug the instrument.
2) Remove the four screws on the sides of the spectrophotometer

.

3) Remove the

Cuvette Holder Control Knob

by unscrewing the rod counterclockwise.

4) Remove the WL. Setting Knob.

a) Use a Flat Head Screw Driver to pick the cover out from the knob.
b) Use a Spanner or Sleeve to loosen the screw in the knob, then remove the knob.

5)

Remove the cover of the instrument very carefully and place it in the back of the
instrument.

BE SURE NOT TO PULL PANEL WIRING LOOSE!

6)

Unplug and remove the lamp from ceramic base (the white connector). Insert the
new lamp; pushing it in as far as it will go.

CAUTION

:

a) Do not handle the lamp with bare fingers. Use tissue or cloth when handling lamp.
b) There’s no difference in polarity of the two legs of Tungsten-halogen lamp.

7) Set the wavelength of the instrument at 500nm, Switch on the power, move the lamp

up and down and from side to side, until its focus falls exactly on the entrance slit.
Observe the reading in T mode without adjusting the

/100%T

key

Readjust the

lamp to make the reading at its maximum. If it can not focus on the center of the
entrance slit, you have to adjust the four screws for the height of the light beam and
the horizontal adjustment.

8) Switch the instrument off, tighten the two screws. Reinstall the instrument cover. Be

sure to prevent all wires from being pinched in the process.

9)

Reinstall the four screws. Reposition the Cuvette Holder Control Knob and the
Wavelength Setting Knob.

2. Calibration of wavelength accuracy

DV-8000 spectrophotometer is checked for its wavelength accuracy by a

point-to-point method against the two characteristic absorption peaks of a didymium
filter---529nm and 808nm.

Содержание DV-8000 Series

Страница 1: ...before installation and operation Drawell International Technology Limited Shanghai Drawell Scientific Instrument Co Ltd Add Suite 1506 Lane581 XiuChuan Rd PuDong New Area Shanghai China Tel 0086 21 5...

Страница 2: ...ng Principle 4 Unpacking Instructions 4 Specifications 5 Installation 5 Introduction 6 Description of keys and operating method 7 Operating Procedures 11 Maintenance 11 Calibration and trouble shootin...

Страница 3: ...es Some of the chemicals used in spectrophotometer are corrosive and or inflammable and samples may be radioactive toxic or potentially infective Care should be taken to follow the normal laboratory p...

Страница 4: ...rects the beam onto the grating The grating disperses the light beam to produce the spectrum a portion of which is focused on the exit slit of the mono chromator by a collimating mirror From here the...

Страница 5: ...instrument 4 Use the appropriate power cord and plug into a grounded outlet 5 Turn on your DV 8000 model spectrophotometer Allow it to warm up for at least 20 minutes before taking any readings Model...

Страница 6: ...to select the Absorbance Transmittance Concentration and Factor mode PRINT key has two functions a To be used in Parallel Port and date transmission one way transmission from the instrument to the Pri...

Страница 7: ...T key till it reaches 1500 Press the MODE key again to go to C mode If the A value measures 0 125 then the C value reads 187 5 Operation Procedures 1 Plug the instrument into a grounded outlet 2 Turn...

Страница 8: ...ack of the instrument BE SURE NOT TO PULL PANEL WIRING LOOSE 6 Unplug and remove the lamp from ceramic base the white connector Insert the new lamp pushing it in as far as it will go CAUTION a Do not...

Страница 9: ...wer line 2 Replace fuse 3 Replace power switch 2 Unstable display 1 Insufficient warm up time 2 Excessive vibration strong air current near light source or strong external light 3 Unstable voltage 4 P...

Страница 10: ...echnology Limited Shanghai Drawell Scientific Instrument Co Ltd Add Suite 1506 Lane581 XiuChuan Rd PuDong New Area Shanghai China Tel 0086 21 50966080 Fax 0086 21 50966080 Web www drawell com cn Email...

Отзывы: