Draper Access FIT E Скачать руководство пользователя страница 5

Section 6 -

 Operation

 CAUTION:

 When operating for the first time, cycle unit down and up several times to confirm satisfactory operation. Be prepared to cut POWER if necessary.

•  110-120V SINGLE STATION CONTROL -

 3-position UP-OFF-DOWN switch permits operation to be stopped at any point. Factory adjusted limit switches 

automatically stop screen when fully down or fully up.

•  110-120V MULTIPLE STATION CONTROL -

 Switches are similar in appearance to 110-120V Single Station Control. Screen stops when switch is released and 

may be restarted in either direction. Factory adjusted limit switches stop screen automatically when fully up or fully down.

•  24V CONTROL -

 3-button UP-STOP-DOWN switches stop at any point desired and operate in any sequence. Factory adjusted limit switches automatically stop 

screen when fully up or fully down. Installer should incorporate an all-pole disconnect in fixed wiring available with RF or IR remote.

•  KEY OPERATED SWITCHING -

 Two key-operated switches optionally available with this unit:

• 

Key-operated power supply switch controls power to screen and switches. When “off”, switches will not operate screen. Key may be removed from switch in 

either "on" or "off" position.

• 

Three-position key switch permits the screen to be operated directly by key. Requires screen operator to have a key.

•  RS232 / ETHERNET -

 Serial communication and network communication optionally available.

Section 7 -

 Tab-Tension Adjustment Procedure

Please Note:

 Draper’s Tab-Tensioning System is factory-set, and under normal 

circumstances will not require field adjustment. If wrinkles are observed, 

however, follow the adjustment procedure shown in Figure 8.

Figure 8

PUSH & TURN

CLOCKWISE

to INCREASE TENSION

PUSH & TURN

COUNTER-CLOCKWISE

to RELEASE TENSION

END OF 
DOWEL

END OF 
DOWEL

page 5 of 8

Access FIT E and V

Содержание Access FIT E

Страница 1: ...al Cutout Tab Tensioning V Dowel E Dowel Mounting Bracket Mounting Bracket Hoisting Bracket Leveling Brackets Hoisting Bracket E Free Hanging Viewing Surface V Flexible Vinyl Viewing Surface Trim Flan...

Страница 2: ...carefully tested to ensure safe and normal operation Extreme care should be taken during testing to remain clear of moving parts to avoid possible injury 12 Operation of unit should be performed only...

Страница 3: ...steners are of adequate strength and suitable for the mounting surface chosen Supporting hardware such as chains cables two 3 8 9 5 mm rods etc must be precisely vertical 4 Entire bottom of case must...

Страница 4: ...knobs are visible from bottom of screen housing Please Note If snap ring is provided make sure it engages with motor If retaining clip is provided instead install to lock motor end in place 7 Support...

Страница 5: ...when fully up or fully down Installer should incorporate an all pole disconnect in fixed wiring available with RF or IR remote KEY OPERATED SWITCHING Two key operated switches optionally available wi...

Страница 6: ...crew turns 1 2 roller revolution 3 Test by lowering screen Repeat steps 1 2 until desired position is reached To Increase Screen Drop 1 Lower screen to down limit 2 With down switch on turn DOWN I lim...

Страница 7: ...of Screen Case Center of Case 3 76mm 13mm 4 124mm 6 164mm 5 130mm 11mm 2 51mm 7 197mm 22mm 16mm 16mm 5 144mm 11mm 1 35mm 7 197mm 6 165mm 3 87mm For minimum length of ceiling cutout subtract 11 4 32mm...

Страница 8: ...N Black COM White UP Red Wall Switch Electrically Straight Data Cable to more LVC IV modules FUSE 3 15 AMP 250 VAC 5x20mm To 110 120 VAC Line Red to screen directional Brown to screen directional Yell...

Отзывы: