DF25 Touring a special sheave box has to be installed below the Spinnaker halyard
position, for this please contact your dealer or Quorning Boats.
IMPORTANT: When stepping the mast – check and be careful that the forestay and the
side stays cables does NOT get bent, if these get bent – you need to change the bent stays
immediately.
Содержание 25 Touring
Страница 1: ...OWNER S MANUAL 25 Swing Wing...
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 20: ......
Страница 26: ...Dragonfly 25 Touring...
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ...Dragonfly 25 Touring Mast Rotating System for mooring in folded position...
Страница 38: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 51: ......
Страница 54: ......
Страница 55: ......