background image

strona: 5 / 12

2.5.

Disassembly and disposal

Disassembly of the awning must be performed by qualified personnel. Awning contains no hazardous
components. Turn to recycling company to reduce the negative influence of waste over the natural
environment.

2.6.

Important notes and warnings

CAUTION!

Roll up the awning in bad weather such as frost, snow, rain and hail.

CAUTION!

If the awning will be used during the frost it can damage your awning.

Note

Possible buckling of the fabric. In the vicinity of the seams and the edges of the
sheathing can form folds and wrinkles - it is natural.

CAUTION!

In case of fault you should refrain from further usage and immediately contact the
installation company.

Note

Stainless steel parts in the event of exposure to external conditions can corrode in a
limited way.

Note

Unroll the fabric of the awning in the wrong direction may damage sheathing and
structures of the awning.

Note

The sheathing may have slightly different color (if coming from different production
types)

CAUTION!

It is not allowed to hang, hook or put anything on the awning.

It is not allowed to hang or placed something on the awning.

Adjustment and repair of awnings by unauthorized persons are not allowed.

CAUTION!

Installation of awnings with electric drive in hazardous environments or where very
large quantities of flammable substances in the air is not allowed.

Содержание Veranda EVO

Страница 1: ...ion Veranda awning EVO General scheme of awning A Brackets B guide rail C Cassette D Front profil E Cassette bracket F Mounting screw 97 A B C F E A A Steering Manual E drive Motor drive with NHK Data of electric drive Power W Voltage 230V Frequency 50Hz YOC Serial Number DRAGON KORGUL PROCHOWSKI SP J Trakt Św Wojciecha 223 225 80 017 Gdańsk EN 13561 External blinds Class of wind resistance B D ...

Страница 2: ...ndard PN EN 13561 2004 A1 2008 Explanation of symbols used in this manual Important Safety Information Notes and general remarks on the safety use Improper use of awnings can have a negative impact on the awning structure and a loss of their properties and thus lead to the deterioration of security CAUTION The warning triangle shows the important tasks in the operation maintenance etc Failure to c...

Страница 3: ...ms awning turn the crank until the awning sheathing will be tight enough It is not allowed to unroll the fabric from the roller tube completely For the Electric drive the system is made of an electric motor and a control switch it can a wall switch remote control and or weather automatic be The Awning is not designed for the other purposes eg protection against other weather conditions CAUTION Rol...

Страница 4: ... noise shall not exceed 70 dB 2 4 Maintenance of awning 2 4 1 Scheduled maintenance of the fabric Turn off the power supply Cleaning of the fabric depends on the type of fabric it is recommended to use the vacuum cleaner wet sponges or cleaning agent recommended by the manufacturer To clean the awning safely should not use ladders or scaffolding If necessary use a garden hose or tools with handles...

Страница 5: ...ON In case of fault you should refrain from further usage and immediately contact the installation company Note Stainless steel parts in the event of exposure to external conditions can corrode in a limited way Note Unroll the fabric of the awning in the wrong direction may damage sheathing and structures of the awning Note The sheathing may have slightly different color if coming from different p...

Страница 6: ...s narrower from 10 to 15 cm than the total width of the awnings frame depending on the type of drive from 10 cm to 15 cm Do not dispose of electrical components in the trash It must be deliver to the point of disposal of electrical equipment ...

Страница 7: ... of the awning 3 3 Service shipment unpacking and storage The awning is so packed that it can be delivered without damage During loading and unloading of the awning be sure it was not placed on an uneven surface We recommend carrying this awning by two people Upon unpacking the product you keep a special care not to damage the fabric If the awning will be stored for a long time before installing w...

Страница 8: ...ery 3 8 2 Mark and fix the mounting brackets 3 8 3 Drill a cable conduit for electric line only for motor drive 3 8 4 To install guide rails to the brackets put cassette into brackets and secure it with screws 3 8 5 Screw front profile to the trolley and check the operation of the awning 3 8 6 Connect motor of awning to the power supply only for motor drive 3 8 7 Handle only for Manual drive or Mo...

Страница 9: ...ing electric cables if motor drive was ordered Drill out grommet for electrical conduit Power to the motor drive should be prepared in accordance with the relevant provisions 3 8 4 To fix guide rails to the mounting brackets and put the cassette into brackets and secure it with screws Fix the guide rails B to the mounting brackets A Put the cassette C with the front profile D to the brackets E and...

Страница 10: ...awning after installation After installation check items from the list below Operation manual or electric Stability Proper operation of limit switches 3 8 9 Training and instruction of the end user before awning in use Installation team must fully inform the end user about safe use of the awnings 3 8 10 All manuals as well as installation and setting instructions of the motor switches and controll...

Страница 11: ...r to replace the sheathing 3 9 3 Replacement of the components The change must be made by an authorized dealer or the awning will be sent to the manufacturer to replace the item 3 10 Start up Any person can t stay in the area of the awning during the test run All items located under the awning must be removed The remote control can be used only if the user see the awning in the whole range of its ...

Страница 12: ...arket Innovative Economy Operational Programme 2007 2013 under the provisions of the Regulation of the Minister of Regional Development of 7 April 2008 on the granting by the Polish Agency for Enterprise Development of financial support under the Operational Programme Innovative Economy 2007 2013 Journal of Laws No 68 item 414 as amended Project title Development of export of Company Dragon throug...

Отзывы: