background image

Installation and adjustment instructions 

Terrace awning Family EVO

Document name: 2010 EN Instrukcja Family EVO 2,11  |  date: 08.07.2010  |  page: 2 / 11

had montage training courses at Dragon company

instructs the user about proper/safe usage of the awning

Information

Awning montage, adjustment and trial runs may be only performed by a qualified 
montage company/persolel. Montage company is responsible for proper installing and 
adjusting the awning (by using proper anchors for montage surface) adjusting the 
awning and testing it.

1.5.

Anchorage and hoisting on ropes

If awning is to be hoisted on ropes, it is required to:

unpack the awning

solidly anchorage awning on rope, in order to prevent realising

when hoisting awning on ropes it is required to keep it in a horizontal position at all times

2.0.

Necessary tools

ladder / scaffolding

spirit level tool

rope to hoist

measuring tape

hammer, drill and drill bits (depending on the montage surface)

allen key(allen 3mm, 6mm)

wrench (SW11 included to the product)

socket wrench (SW13)

tools suitable for the chosen montage method (anchor type etc)

3.0.

Order of assembly

3.1.

check the content of delivery

3.2.

mark and attach mounting brackets to the monting surface

3.3.

bringing power to the awning engine (in case of ordering an electric engine)

3.4.

hang awning on brackets and fasten it

3.5.

set the angle of the awning

3.6.

regulate the position of the front bar

3.7.

prepare electric connection  (in case of ordering an electric engine)

3.8.

Usage of crank (for awnings with manual drive or NHK)

3.1.

Check the content of delivery

before mounting, it is required to check:

if the awning type, colour and patern of the fabric, colour of construction, drive type (crank / engine) 

and drive side is in accordance with the order

if proper parts in proper quantity were delivered (look Content of delivery pos.1.2.)

3.2.

Mark and attach mounting brackets to the monting surface

The awning is supplied with brackets for installing to the wall or ceiling

 

 – compatible with the order. Awning 

meets the specified wind class only if it is installed in accordance with the manufacturers precommendations, 
the right type of mounting brackets including appropriate anchors, at the appropriate monting surface. 
Before installing, check whether the monting surface is suitable for mounting – in case of weaker strength of 
the monting surface structure it is required to order additional mounting brackets (quantity delivered as 
standard has been provided for the monting surface with B25 class concrete strength ).

Mark on the monting surface where the brackets should be placed and then drill holes. (location of 

the bracets are shown on the figure bellow)

Содержание Family EVO

Страница 1: ...x instruction for connection and adjustment of the electric motor for awnings with electric motor 1x instruction for remote control and or weather sensor for awnings with this equiptment 1x crank for...

Страница 2: ...awning engine in case of ordering an electric engine 3 4 hang awning on brackets and fasten it 3 5 set the angle of the awning 3 6 regulate the position of the front bar 3 7 prepare electric connectio...

Страница 3: ...ed in the middle of the awnings width position D with tolerance of 5 cm 4 Brackets if ordered additionally two brackets should be placed at a distance of not more than 10 cm from the outer edge of the...

Страница 4: ...given weight and size put the awning in prepared mounting brackets by sliding the square bar in the brackets slot fasten the awning in the mounting brackets by using the supplied screws M8x60 and wren...

Страница 5: ...ve achieved the desired angle you must screw in the B bolt in all arms which were regulated B When you change the arm angle the front bar needs to be adjusted Description of this task is written below...

Страница 6: ...Roll out the fabric until it lies on the arms of the awning to do this with an electric engine you must change the marginal settings according to the instructions of the engine the fabric lying freel...

Страница 7: ...ss of recording these changes the Change of engine end positions In order to make changes to the programmed marginal settings of the awning engine follow the instructions of the engine instruction is...

Страница 8: ...instructions for connecting and controlling the electric drive optional instructions for the sun wind sensor and the remote control optional reception protocol User should be thoroughly instructed by...

Страница 9: ...ternal conditions can corrode in a limited way Information Awning fabric rolled incorrectly check point 3 8 may cause damage to the fabric and construction of the awning Information In different deliv...

Страница 10: ...cup 3 montage plate of the cassette 4 gear for the manual drive for the left or right side of the awning 5 tip of the roller tube or electric drive mount depending on the ordered side 6 end cup of the...

Страница 11: ...e G allen bolt 20 part of the front bars adjustment suporter contains slot E II Arm 21 lower arm end 22 lower arm profile 23 lower arm hinge part 24 cable 25 adjusting bolt only on the right arm used...

Отзывы: