DR
®
POWERWAGON
™
Safety & Operating Instructions
1
Assembly
The DR
®
POWERWAGON
™
is shipped almost completely assembled. Please read the
following instructions before removing the machine from the crate and completing the
assembly.
Parts Bag Contents:
(1) 5/16" x 1-1/2" Bolt for the Handlebar
(1) 5/16" Lock Nut for the Handlebar
(1) Cable Tie for the Cable Assembly
Install the Upper Handlebars
Tools Needed:
(2) 1/2" or adjustable wrenches
1.
Position the cable assembly on the right
side of the frame (when standing in the
operating position). Secure the cable
assembly to the frame with the cable tie
provided
(Figure 1)
.
2.
Position the upper handlebar inside the
lower handlebar, mount the 5/16" x 1-1/2"
bolt and secure it with the 5/16" lock nut
(Figure 2)
. You may adjust the handlebar
height at any time by removing the bolt
and repositioning the upper handlebar in a
different hole.
Figure 1
Figure 2
WARNING!
The DR
®
POWERWAGON
™
is shipped
without gas and oil. DO NOT attempt to
start your DR
®
POWERWAGON
™
until
assembly is complete, and you've added
the correct amounts of gas and oil.
Содержание POWERWAGON SUBURBAN
Страница 9: ...DR POWERWAGON Safety Operating Instructions 3 Controls Features Figure 6...
Страница 28: ...DR POWERWAGON Safety Operating Instructions 22 Main Frame Assembly Figure 35...
Страница 29: ...DR POWERWAGON Safety Operating Instructions 23 Handlebar Controls Assembly Figure 35...
Страница 30: ...DR POWERWAGON Safety Operating Instructions 24 Axle Assembly Figure 36...
Страница 31: ...DR POWERWAGON Safety Operating Instructions 25 Molded Body Assembly Figure 37...
Страница 32: ...DR POWERWAGON Safety Operating Instructions 26 Stake Body Assembly Figure 38...
Страница 33: ...DR POWERWAGON Safety Operating Instructions 27 Notes...
Страница 34: ...DR POWERWAGON Safety Operating Instructions 28 Notes...
Страница 35: ...DR POWERWAGON Safety Operating Instructions 29...