Mach LED 2
MC/SC
Dr. Mach
Lamps and Engineering
59160001-MCSC
Edition 06
08.05.2013 / Bak page 22/34
6. Maintenance
MACH LED 2
MC/SC
lights are supplied with brakes on the suspension fixture and on the lamp housing.
Adjust these brakes, if necessary, after installation.
Preventive maintenance of the light should be done every two years. This includes a technical and me-
chanical check-up.
Please observe also the manufacturer’s mounting instructions for the ceiling and wall attachment.
In order to keep the system easy-running throughout its life span, we recommend that the hinges
should be greased once a year with acid-free grease.
Attention:
Set the height adjustment, if applicable, of the spring arm to horizontal position before dismount-
ing the lamp, (Please observe also the manufacturer’s mounting instructions for the ceiling and
wall attachment).
Attention: During all maintenance work the light must be disconnected from
mains and secured against resetting.
6.1. Periodical maintenance work
The following maintenance work / tests has / have to be done every six months:
check on defects in paint work;
check on fissures at plastic parts;
check on deformation of the suspension.
The following maintenance work / tests has / have to be done once a year:
check the function;
electrical
safety
test;
check the suspension.
Check and grease the security segment once a year.
For adjustments at the ceiling attachment please observe also the mounting instructions “
Ceiling
attachment with heavy central axis
” or “
Ceiling attachment – wall attachment
”.