5
DISTANCES TO RESPECT
•
Top of the proofer: a clearance of 24 to 36 inches to the ceiling must exist to permit
maintenance.
•
Back and sides: 1 inches.
I N S T A L L A T I O N
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and
accessories..
Each unit is set up to be used with the electrical supply specified on the name plate fixed on the front
of the unit.
1. To the electrician.
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
2. To the plumber.
Connect the steam system (1/4 pipe) to the water distribution network.
Warning
Do not adjust the needle valves it has been done at the factory
.
3. To the plumber
This equipment is to be installed to comply with the applicable federal, state or local plumbing codes.
Connect the steam system (1/4 NPT) to the cold water distribution network. We highly
recommend a water softener to eliminate minerals in the water. We suggest to use CUNO #
CFS6135 (Doyon part number PLF240).
Содержание E2330PA
Страница 11: ...11 E2330PA PM DIMENSIONS ...
Страница 12: ...12 ...
Страница 13: ...13 E2330PMC DIMENSIONS ...
Страница 14: ...14 ...
Страница 15: ...15 E2330 COMPONENT PARTS ...
Страница 16: ...16 ...
Страница 18: ...18 ...
Страница 20: ...20 E2330 ELECTRIC SCHEMATIC 120 VOLTS ...