![Dover Wilden Advanced H25 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/dover/wilden-advanced-h25/wilden-advanced-h25_engineering-operation-and-maintenance_2525060015.webp)
ASSEMBLY:
Upon performing applicable maintenance to the air distrib-
ution system, the pump can now be reassembled. Please
refer to the disassembly instructions for photos and parts
placement. To reassemble the pump, follow the disassem-
bly instructions in reverse order. Please find the applicable
torque specifications on this page. The following tips will
assist in the assembly process.
•
To ease in the reassembly process, mark a line from the
liquid chamber to the chamber cover. This will assist
with proper alignment during reassembly.
•
Apply a small amount of Loctite
®
242 to the
power/liquid bolt threads.
•
If air continually blows out the exhaust in very large
quantities, it is possible that it may be saved by
completely disassembling the valve, cleaning all
components and re-lubricating the valve.
•
If pump stops running or begins to run slowly, inspect
return spring located at the bottom portion of air valve
for damage.
•
When installing inlet air or exhaust connections, use
correct porting on the air valve or pump will not run.
(See example below for correct connections)
.
Description of Part
Torque
Inlet Manifold Plate
13.5 N•m [10 ft.-lbs.]
Combo Manifold Plate
13.5 N•m [10 ft.-lbs.]
Liquid Chamber
13.5 N•m [10 ft.-lbs.]
MAXIMUM TORQUE SPECIFICATIONS
SECTION 7B
REASSEMBLY HINTS & TIPS
Air Exhaust
Air Inlet
Содержание Wilden Advanced H25
Страница 19: ...TT5178...