![Dover PSG Wilden PRO-FLO P1500 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/dover/psg-wilden-pro-flo-p1500/psg-wilden-pro-flo-p1500_engineering-operation-and-maintenance-manual_2525037018.webp)
WIL-11160-E-10
18
P1500 Bolted Plastic
REASSEMBLY HINTS AND TIPS
Upon performing applicable maintenance to the air distribution system,
the pump can now be reassembled. Please refer to the disassembly
instructions for photos and parts placement.
To reassemble the pump, follow the disassembly instructions in
reverse order. The air distribution system needs to be assembled first
then the diaphragms and finally the wetted path. The applicable torque
specifications are on this page.
The following tips will assist in the assembly process:
Lubricate air valve bore, center section shaft and pilot spool
bore with NLGI grade 2 white EP bearing grease or
equivalent.
Clean the inside of the center section shaft bore to ensure
no damage is done to new seals.
A small amount of NLGI grade 2 white EP bearing grease
can be applied to the muffler and air valve gaskets to locate
gaskets during assembly.
Make sure that the exhaust port on the muffler plate is
centered between the two exhaust ports on the center
section.
Stainless bolts should be lubed to reduce the possibility of
seizing during tightening.
Maximum Torque Specifications
Description Torque
Air Valve
8.5 N•m (75 in-lb)
Outer Piston
136 N•m (100 ft-lb)
Air Chamber/Center Block
4.6 N•m (55 ft-lb)
Tee Section/Elbow
3.4 N•m (32 ft-lb)
Elbow/Liquid Chamber
3.4 N•m (32 ft-lb)
Liquid Chamber/Air Chamber
3.4 N•m (32 ft-lb)
Diaphragm Ring and Outer Piston Assembly
18.9 N•m (14 ft-lb)
DISASSEMBLY / REASSEMBLY