Page 86 of 145
13.1 Prior to Installation
Check the following:
1. Enclosure Mounting:
Knockouts and mounting means are provided for all cabinetry
.
Do not drill holes in any of the enclosures.
Doing so would violate the safety listing of the system.
2.
Grounding
:
For applications where wire conduits are used, follow the applicable
local codes and requirements.
An ACR/RIM system incorporates internal noise suppression
circuitry. In order to ensure proper operation of the equipment
and provide the necessary safety must be grounded. A ground
wire - if applicable, per local code - must be connected
between the ACR/RIM ground terminal and the main electrical
service panel.
In applications using conduit, the conduit should not be used as ground!
3. Circuit Breakers:
Power to the ACR/RIM must be supplied from dedicated
circuit breakers.
No other equipment should be powered from these breakers
including the pumps that are monitored (passively) or
controlled (actively).
13.2 Installation Procedure
All dispensers and controller are
installed according to manufacturer’s
specifications and should be tested for proper operation.
1. OPW Tank Gauge is installed to specifications
2. Mount ACR/RIM
3. Connect ACR/RIM to specific dispenser box
4. Test ACR/RIM
5. Connect ACR/RIM
6. Conduit Requirements: (if applicable, per local code)
ACR/RIM Power Conduit
•
Where applicable, this conduit, following all local codes,
should run from the main circuit panel to the ACR/RIM.
•
This conduit should only contain the Terminal Feed,
Neutrals and Ground wires.
ACR/RIM Pump Loop Listener
•
This conduit should run from the ACR/RIM to the location
of the Pump D-Box.
Содержание OPW SiteSentinel iSite
Страница 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Страница 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Страница 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Страница 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Страница 33: ...Page 33 of 145 www opwglobal com ...
Страница 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Страница 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Страница 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Страница 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Страница 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Страница 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Страница 143: ...Page 143 of 145 www opwglobal com ...
Страница 146: ...Page 146 of 145 www opwglobal com NOTES ...