38
3 INSTALLATION
STEEL INSTALLATION PROCEDURES
DOCK INSTALLATION
If the appropriate accessories are ordered from Marathon Equipment Co., the compactor/
container will be furnished with either a four-sided hopper or a three-sided hopper with a
hinged gate. THESE ACCESSORIES SHOULD NOT BE ALTERED AS THEY ARE MANUFACTURED
IN ACCORDANCE WITH THOSE STANDARDS WHICH PREVAIL AT THE TIME OF
MANUFACTURE.
If the compactor/container cannot be directly abutted to the dock or if there is any difference
in height between the dock and the compactor/container, an appropriately sturdy transition
section should be provided by the customer and securely affixed to the dock. Along with the
transition section, a compactor/container guidance/stop mechanism should be installed to
assure that the unit does not bottom out against the transition section or dock during dock
placement (See ANSI Z245.2 Safety Standards). Optional container guides with stops are
available from Marathon and are recommended for proper dock placement of the compactor/
container.
3 INSTALLATION
CHUTE-FED INSTALLATION
Compactors installed in this arrangement are normally fed "through-the-wall". The lower edge
of the access hole in the wall should be a MINIMUM of 42" (and, if possible, not more than
58") from the inside floor level. A security door (in accordance with local code) should be
installed in the wall opening. In the absence of a local code, this door should be constructed of
3/16" thick steel or of steel hollow core design and be lockable from the inside of the building.
DECALS
Be certain that the appropriate decals are in their proper locations at all times on the machine.
For decal locations, see “DECALS” and “DECAL PLACEMENT” in the Operation section of this
manual.
NOTE:
Installation is not complete until all decals are in place.
Содержание Marathon RAMJET Signature J-250SC
Страница 15: ...15 This Page Intentionally Left Blank ...
Страница 26: ...26 2 MAINTENANCE POWER UNIT STANDARD 5 HP MECO Match the reference numbers to the chart on the next page ...
Страница 28: ...28 2 MAINTENANCE POWER UNIT DRY 10 HP MECO ...
Страница 47: ...47 This Page Intentionally Left Blank ...