35
NEVER use the set screw or any other device as a
replacement for the load bearing pin (B).
9.
If equipped, install retaining pin (C) on load bearing
pin (B).
10.
Tighten setscrews (A) to the torque specified by
the manufacturer.
11.
Tighten jam nuts to the torque specified by the
manufacturer.
12.
Check tightness after 50 miles of towing.
13.
Couple the trailer to the tow vehicle and verify that
the trailer is level front to rear. Adjust if necessary.
14.
Unload trailer. See Loading And Unloading.
Coupling To Tow Vehicle
Содержание Gooseneck Series
Страница 13: ... 13 2 2 17 Safety Warning Labels On Your Trailer Safety ...
Страница 50: ... 50 ...
Страница 51: ... 51 ...
Страница 52: ... 52 ...