Plug in the ePC. The Power LED light will be
lit green.
When the Water Meter closes the contact, all
four (4) LEDs will light up indicating the signal is
being made for each device installed.
If you need to install a 3rd or 4th pump, remove
the lower access panel in front of the ePC.
With the use of a punch tool, run a small hole
through the rubber cap, and thread the lead
wires to connect the pumps.
ulse
P
4
5
6
ontrol
C
Rubber Cap
NEED HELP? Call 1-800-451-6628
ePC Installation
(Continue)
NOTE:
Installation illustrations are to be used as a reference guide only.